Showing posts with label Railways. Show all posts
Showing posts with label Railways. Show all posts

Saturday, 11 January 2014

ABERTILLERY RAILWAY STATION

The town of Abertillery in Blaenau Gwent (has a population of about 18,000) and high unemployment. As a former mining town, since the 80's,has suffered a significant increase in benefit receipt, a significant decline in amenities and relatively low economic and employment opportunities. In Scotland simular former mining towns have benefited economically and socially from having old railway lines to Glasgow opened. The re-opening of the Ebbw Vale line to Cardiff (and hopefully eventually to Newport) has brought opportunities to the Ebbw Valley.

Sign the petition to open a train station at Abertillery.

A direct rail link and a railway station in Abertillery would give people access to job opportunities in Cardiff and on the coastal belt. The restored rail link would also bring tourism to a beautiful and historic part of our country. At present the floored devolution settlement means that the Department for Transport makes the final decision on re-opening old railways and building new stations, even if the National Assembly wants it done.

Wednesday, 18 December 2013

SOME ROOM FOR IMPROVEMENT…

Making tracks for Cymru / Wales?
The study for the Campaign for Better Transport, which makes interesting reading, shows that rail services in Wales are used less, have lower levels of passenger satisfaction, are lagging behind other parts of the UK and could be improved by devolving responsibility for our railways from Westminster to Wales. The report was released as details were released of a £ 24 million pounds ( includes £17m from the European Regional Development Fund (ERDF) £ 5.1 million pounds from the Welsh Government, £ 700,000 pounds from Network Rail, and £ 400,000 pounds from Arriva Trains Wales) for much needed upgrades of railway stations at Rhyl, Aberystwyth, Pontypridd, Port Talbot Parkway and Ystrad Mynach. Improvements to the five railway stations will see welcome improvements to customer facilities, better access, increased capacity and more park and ride spaces.

The devolved Scottish rail service has delivered more and fared better than our rail service which is still managed by Whitehall. Discussions between the Department for Transport and the Welsh government in relation to scoping out the feasibility of devolving responsibilities for the rail franchise held until 2018 by Arriva Trains Wales are said to be on-going. Any comparison between Scotland and Wales is pretty much always going to be stark, with devolved management of services in Scotland consistently delivering significantly better results than the equivalent un-devolved management of services in Wales. Wales and Welsh interests are always going to come pretty low down the list in the priorities of a largely England focused Whitehall government department.  

There is considerable room for improvement when it comes to the provision and development of our railway services here in Wales. Firstly, full control of the transport budget and related planning regulations needed to be devolved to the Welsh Government and secondly when the franchise is renewed in 2018 the railways in Wales should be run on a  not for dividend profit basis, with all profits being ring fenced and reinvested into our railways. The healthy profits run up during the period when the East Coast mainline serve has been run by the Westminster Government after the collapse of the private franchise shows what could possibly be achieved here in our country.   

Sunday, 20 October 2013

SEVERN TUNNEL CLOSED; ENGLAND CUT OFF

As a regular rail user the news that the Severn Tunnel is going to be closed for maintenance this weekend and next weekend has greeted me every morning (at Newport Station) for some weeks. I suspect that the First Minister is perhaps not a regular rail user, perhaps the government limo is too comfortable and too convenient, ideal perhaps for snoozing in whilst going to and from work.   

Severn Tunnel closed - England cut off!
The Welsh First minister’s criticism of Network Rail over the planned closure of the Severn Tunnel for maintenance, on the same weekend as the opening ceremony for the Rugby League World Cup, and the Womex music festival (both in Cardiff), might have a shred of validity if plans to upgrade the diversionary route via Kemble, in Gloucestershire to Swindon had not been dropped in November 2008, under the last Labour Westminster Government.

When the Severn Tunnel is closed for maintenance rail traffic from South Wales is diverted via a single-track 12-mile section of line between Swindon and Kemble (in Gloucestershire). Plans to upgrade this section to double track as it is the only diversionary route between Wales and London were conspicuous by their absence from Network Rail’s plans in 2008/2009. This is a vital link between Wales and London (and Europe) and the only alternative to using the Severn Tunnel.

The origins of the present problems date back to November 2008 (when Labour were in office at Westminster) when the Office of Rail Regulation’s settlement for Network Rail allocated £26 billion pounds - 2.4 billion less than requested; forcing Network Rail to drop a number of projects. Lost amidst the small print of this decision was the decision to drop a plan which would have restored of the 12 miles of single track to double from Kemble to Swindon.

In the event of a major accident or incident in the tunnel, perhaps a crash, a fire or even flooding, then we need a fully operational alternative so that passenger and freight services to London are not affected. Talk to anyone who works the rails (or anyone who has relatives who work on the rails) in the south and they will tell you that the aging Severn Tunnel is going to require more maintenance as time passes, it remains a vital transport link, but it ranks pretty low on Network Rails or Westminster’s list of priorities.

We badly need some original thinking to solve this potential block on our rail links; the construction of a railway bridge / tidal fence close to the Second Severn Crossing should be seriously considered as part of any plans to harness the enormous renewable energy potential of the Severn Estuary. This could carry the main rail link from South Wales, solving the problem of the Severn Tunnel, enhance rail services from Severn Tunnel Station and generate sustainable energy, which we will need in the near future.