HS2, 5%, WALES AND THE UNION

The much publicised Westminster government's plans to extend the HS2 rail development to Manchester (Stage 2) has stirred up a whole range of reactions in England from approval to objections and much in between. This investment focuses on creating a high speed rail spine in England from London to Birmingham and then onto Manchester and Leeds.

The Scottish Government has rightly called for a "concrete timetable" to extend the HS2 high-speed rail network to Edinburgh and Glasgow, calling on the UK Department for Transport to clearly spell out when high-speed rail project would reach Scotland. Fair play to Scotland Now that’s fair enough but what about Wales, will we see any benefits (fringe or otherwise)? Over to the Welsh Government then... ?

Labour in Wales’s less than eloquent silence aside, the bottom line is quite simple if unionists want the union to work for all of its inhabitants then what’s Wales’s share of the investment in the transport infrastructure programme. The Westminster Government has to ensure that any investment in transport infrastructure must benefit the whole of the UK, not just England. If the unionists believe in fair funding for the constituent parts of the UK then Wales is owed a Barnett consequential of approximately £1.9 billion from the projected HS2 spend.

If David Cameron is serious about making the union work then it’s time that this Westminster Government to urgently review the flawed and unfair funding arrangements. The lack of investment (and lack vision) that exists when it comes to developing and improving Welsh transport links that goes way beyond the current (and historical) poor financial settlement. The electrification of the great western line from Swansea to Cardiff (and beyond) is significant but is long overdue.

The electrification of the Glasgow-London line was completed in 1974, if nothing else this highlights how far behind (if not out of sight and out of mind) we are in terms of any improvements to transport links. It is also worth noting that Liverpool has long had an electrified rail link to London and has scarcely benefited economically from it. The commitment to electrify the Valley lines is a major step forward, but, as yet Wales, Albania and Moldova have no electrified railways at all.

If we are serious about delivering reliable, effective and sustainable all weather communications to our communities then it’s time to consider reopening old railway lines to passenger and rail freight. Reopening the old railway lines between Llangefni on Anglesey, Caernarfon to Bangor, Aberdare and Hirwaun (in the Cynon valley) and Usk (via Little Mill) to the main line and between Builth Road to Builth would make a real difference.

Having a minor let alone a major infrastructure investment policy that functions outside of England would demonstrate that this Westminster Government is actually serious about making the union work for all its inhabitants. Investing in our public transport system would reduce carbon emissions and cut road congestion. Reopening and refurbishing our old railways and upgrading our existing lines for passenger and fright traffic could provide serious economic stimulation to the local economies and provide a real opportunity for our people.

Tuesday, 17 July 2012

A GREEN LIGHT?

Like many people I welcome the proposals to introduce electrification to the Valleys Lines rail network, something that is long-overdue and will be an important investment in our country’s somewhat neglected transport system. I view the proposed if limited electrification of parts of Valleys Lines network as a good start, with more to follow. What we should get is the electrification of the following lines:

  • Cardiff Central to Cardiff Queen Street
  • Cardiff Queen Street to Aberdare
  • Cardiff Queen Street to Cardiff Bay
  • Cardiff Queen Street to Coryton
  • Newport to Ebbw Vale
  • Cardiff Central to Maesteg via Pontyclun, Bridgend
  • Abercynon to Merthyr Tydfil
  • Grangetown to Penarth
  • Cardiff Central to Danescourt via Radyr (City Line)
  • Cardiff Queen Street to Rhymney
  • Pontypridd to Treherbert
  • Cardiff Central to Bridgend via Barry - Bridgend (Vale of Glamorgan)
  • Barry to Barry Island
  • Bridgend to Swansea
This is a good start, which combined with the electrification of the main line from Swansea to Paddington, will begin the modernisation of our railway network. This when combined with the Wales and Border franchise being run as not-for-dividend social model (which could happen when the franchise expires in 2018) could lay the ground work for a renewal of our railways in Wales.

The omission of any reference to reopening the final stage of the line from Ebbw Vale to Newport is disappointing and is something that needs immediate action. Over the medium term electrification should be extended to the other Gwent lines, through to Abergavenny and Chepstow.

If the governments in Cardiff and London were serious about our railways then serious consideration also needs to be given to looking at reconnecting some of our towns to the rail network. A good follow on would be reconnecting Caernarfon, Dolgellau and Builth Wells to the network, reopening the Llangefni and Amlwch on Ynys Mon, improving North – South rail communications and getting freight off road and back onto our railways.

Tuesday, 10 May 2011

LEGISLATE OR ADMINISTRATE?

The new National Assembly, post referendum and post election now has legislative powers - one question that needs to be asked (and answered) is how will those legislative powers be used and to what end? One area for potential legislation is that of our railway network (such as it is). In the last twelve years there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly the Vale of Glamorgan Railway Line (which re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (which re-opened for passenger services on Wednesday 6th February 2008) were by their nature administrative rather than legislative unlike in Scotland (where specific bills to reopen old railways have been vigorously debated, scrutinised, amended and passed by the Scottish Parliament.

I mention this because I was just wondering when will we see bills placed before the National Assembly to:
  • A bill to reopen the Ebbw Vale (Rogerstone) to Newport railink 
  • A bill to reopen the Llangefni and Amlwch railway
  • A bill to construct new railway stations at Caerleon and Magor 
  •  A bill to reopen the Aberdare and Hirwaun railway (in the Cynon valley)
  • A bill to set aside and protect old railway lines from development in Wales for potential reopening

Tuesday, 25 January 2011

ON THE RIGHT LINES

Network Rail is looking at restoring services on the disused Amlwch branch line (on Anglesey) that closed to passenger traffic more than 35 years ago. The old line between Llangefni and Gaerwen shut in 1964 but remained in use for chemical freight until the early 1990s. The four-and-a-half miles (7.2km) of track will be subject to a feasibility study will see engineers looking at 31 bridge and culverts, as well as earthworks on the route. They will also examine the feasibility of refurbishing the Llangefni station building and its disused platform. This is good news - any chance that network Rail can have a look at the old line between Little Mill and Usk, with a view to similar feasibility study?

Sunday, 21 November 2010

REACTING TO CONSEQUENCES

One of the consequences of the Comprehensive Spending Review, may well be that the proposed £1.1 billion pound Swansea to London rail electrification project bites the dust. Plaid's Ieuan Wyn Jones successfully negotiated the multi-million pound the extension of the proposed upgrade and electrification of the rail line between Swansea and London last year. The original electrification project was (as proposed by New Labour) was only intended to extend as far as Bristol, and only after the intervention of the Plaid driven One Wales Government did they agreed to electrify the line as far as Swansea.

The silence from the ConDem Government in Westminster, in relation to the fate of this project could at best be described as evasive or at worst described as telling when it comes to committing to the extending the electrification programme into Wales - so much for Wales being a ConDem priority. There has been plenty of financial white smoke from the Treasury, but, as yet no clear answer either way.

Here are some statistics to think about:

Electrified Rail in Europe


Switzerland: 100%
Sweden: 77%
Netherlands: 73%
Italy: 69%
Germany: 56%
Spain: 56%
UK: 40%

Source: UIC Website: http://uic.asso.fr

Electrified Rail in Wales (After 13 years of New Labour Government).


Wales: 0%

I think that we are too focused on the rail link to London, which has long needed electrification, it's far too easy to end up endlessly complaining about how Wales is left out of this, fails to get that, etc. Wales is unfairly funded - fact. Let's move on, and see what we can achieve with what we have got. The Con Dem's are unlikely, no matter how well reasoned the case is and no matter how well explained the arguments are, not going to change their mind or their position in relation to fair funding for Wales.

So lets' get practical, let's give some real and serious consideration be given to electrifying the valley lines down to the coastal belt. What we are talking about is the Ebbw Vale to Cardiff (and eventually to Newport) line, the lines in Western Gwent, the lines down from Rhondda, Cynon and Taff Valleys to Cardiff and lines into Swansea and Bridgend.

Now if we use part of WAG's Annual Transport budget, which comes in at around £0.76 billion. If we make creative use of European matched funding then we could be talking about doing the business. Sion Barry (in the Western Mail 24th September 2010) estimated that some £200 million would pay for the electrification of the valley lines into Cardiff. Liverpool has long had an electrified rail link to London and has scarcely benefited from it. We can do the London link later, lets do something lasting for our Valley communities and lets look doing it now.

We also need to look at reopening old railway lines, feasibility studies into the possibilities of reopening to old railway lines (between Llangefni on Anglesey and Bangor, and between Aberdare and Hirwaun in the Cynon valley) to passenger traffic have already been called for from Network Rail. Similar feasibility studies need to be undertaken on the old railway lines between Usk via Little Mill to the main line and in the Wye Valley between Chepstow and Monmouth.

If we are serious about delivering reliable, effective and sustainable all weather communications to our communities then reopening old railway lines initially to passenger and then to rail freight is the way to go. These lines to Usk and to Monmouth via Chepstow which were originally closed by the then Conservative Government which initiated significant and damaging cuts to rail services via the Beeching review of rail transport.

If Government in both London and Cardiff is really serious about cutting carbon emissions and road congestion then reopening these lines to rail and fright traffic could provide serious economic stimulation to the local economies and provide a real opportunity for people to make use of public transport which would reduce road congestion. Let's get to work.