A GHOST TRAIN?

Occasionally if you look very quickly on Newport Station, you may see the platform indicators flagging up an Ebbw Vale bound train. This may be the closest many rail passengers will come to seeing a ghost train. Despite regularly oft-repeated promises from the Labour in Wales government in Cardiff and more locally elected Labour in Newport representatives, there is no sign any time soon of a permanent rail connection between Ebbw Vale and Newport.

Nothing to see here... move along...

Since the Ebbw railway line reopened in 2008 and the new rail service failed to connect to Newport and the rest of the south east a variety of lame excuses have been offered which barely conceal that fact that the Welsh Government has been dragging its feet. Ironically periodic upgrades to track and signals in and around the Cardiff area meant that services do actually occasionally start and terminate at Newport.

The failure to connect the Ebbw vale line to Newport meant that commuters who live in the communities in the Ebbw valley are unable to travel directly to Newport by train and have little choice but to use their cars. They have been denied the opportunity of catching connecting trains to Bristol, Cheltenham, and beyond as well as travelling slightly more rapidly to Cardiff in the morning and back again in the evening.

This was simply a bad short sighted decision that resulted in commuters having little choice but to choose to drive to work. This lack of an easily accessible alternative helped to feed congestion on the M4. If we are lucky at some as yet undetermined future date the Ebbw vale link may actually begin to benefit those commuters who daily travel east to and from work.

What seems to be missing here in Wales is any real element of reopening old (or building new) railways as has happened in Scotland. In Wales in the last seventeen years there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (which re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (which partially re-opened on Wednesday 6th February 2008).

The reality was that these were largely administrative rather than legislative projects, and but for the existence of the National Assembly it is unlikely that they would have been hauled up from where they lingered on Network Rails’ priority list.  The National Assembly, has been (with a few exceptions) been pretty muted when it comes to making the case for rail.

This has certainly not been the case in Scotland, where bills to reopen old railways have been vigorously debated, scrutinised, amended and passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.

The Transport (Wales) Act, which came into effect in February 2006, gave the National Assembly powers if not the political will to plan and co-ordinate an integrated transport system. How much longer do we have to wait to see some vision? And some action?

In the meantime the largely non UK owned rail companies have been busy ramping up rail fares and quietly attempting to reduce rail services (they have been thwarted in the later endeavour by some well organised local pressure groups in the case of Severn Tunnel and Chepstow in South East Gwent). All of these things have been done with the tacit co-operation of various Westminster and Welsh Governments and the Department for Transport (in London).

Such duplicity can never been acceptable – it would be nice if the government in Cardiff woke from its self induced slumbers and took the long term view, and actually put its money where its mouth is and work to redevelop our rail services, boost the development of rail freight and to co-ordinate rail and bus services across the whole of Wales. To do this effectively Wales needs to have full control of its transport policy and transport budget devolved as quickly as possible and the franchise when it is renewed in 2017/2018 needs to be run on a not for profit basis.

The creation of a not-for-distributable-profit organisation to run Welsh railways is vital; profits would be available to invest in rail services. This could mean more frequent services in the South Wales valleys, more frequent journeys to West Wales and on the Cambrian line, as well as additional services between the north and south of Wales.

A Newport bound train from Ebbw Vale surely not?
This could also mean more investment in new rolling stock to help keep pace with increasing passenger demand.  Now, the clock is ticking as most of the preparatory work for the re-franchising needs to be undertaken during the current National Assembly term, so that a delivery model that is better suited to the needs of the people in Wales rather than the foreign state-owned railway shareholders dividend can be developed. 

Here in the south east, Abergavenny, Caldicot, Chepstow and Severn Tunnel railway stations should be real local transport hubs, with fully integrated local bus services. Better facilities for passengers are needed and the provision of adequate safe secure parking facilities is urgently required.

A feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station west of the town of Usk would benefit local commuters and rail travellers and reduce congestion. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic and timber shipments would also help. As would a realistically scoped feasibility study into developing regional rail freight services, removing heavy Lorries from local roads. 

Such developments would provide a regular rail service to local residents and reduce the ever-increasing traffic burden from already overcrowded roads. One real local priority is the completion of the final stage of the rail-link from Ebbw Vale to Newport needs to be completed and railway stations at Caerleon (which has been in the UDB since 1986), it should not be a case of a station at Llanwern or Magor it must be both as they would all help to reduce road congestion.

Monday, 25 April 2016

A SOUTH EAST WALES METRO

Time to get SE Wales moving...
In Monmouth constituency and across the south east we need to ensure that our railway stations have more frequent stopping services and have safe, secure and reasonably priced park and ride facilities at Abergavenny, Severn Tunnel and Chepstow. New railway stations at Llanwern, Magor and at Caerleon would do much to cut congestion and boost connectivity within a SE Wales Metro. 

Our bus services should be fully integrated with our rail services and our railway stations should be fully accessible with easy access to services for all passengers. The National Assembly should commit to redevelop and expand our rail services, as has happened in Scotland. Personally I would work for feasibility studies into opening a new station near Little Mill / Penperlleni and into the reopening of the line to Usk and the construction of a new station west of the town. 

Research by the IMF in 2015 calculated that for every £1 spent on infrastructure some £3’s worth of additional economic activity is created. Wales needs investment, job creation and improvements in its infrastructure; such investment could yield real meaningful and lasting benefits for our people and our communities. The more job creation we can stimulate and the better improvements to our infrastructure, then the better the long-term prospects will be for the Welsh economy.

Sunday, 13 January 2013

A CASE OF YES AND NO...

As elements of it directly affect Wales and as far as it goes, I cautiously welcome the new Network Rail modernisation programme which was announced last Tuesday. The electrification of the Great Western line from Swansea to London is the commitment to extend electrification to some of the Valley lines into Cardiff. Some £ 350 million pounds worth of investment has been allocated to electrify the Valley lines into Cardiff.

I have serious concerns about the apparent exclusion of the final stage of the Ebbw Vale line into Abertillery and into Newport from the plan and the timescale. The Network Rail plan suggests that even its somewhat limited Valley lines electrification programme will not be completed until around 2020. From an economic point of view it would make more sense to commence work on the Valley lines electrification programme as soon as practically possible.

What missing as far as I can see is any real element of reopening old (or building new) railways as has happened in Scotland. In Wales in the last thirteen and half years there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (partially re-opened on Wednesday 6th February 2008).

These were administrative rather than legislative projects, and but for the existence of the National Assembly it is unlikely that they would have been hauled up from where they lingered on Network Rails’ priority list.  The National Assembly, has been (with a few exceptions) been pretty muted when it comes to making the case for rail. This has not been the case in Scotland, where bills to reopen old railways have been vigorously debated, scrutinised, amended and passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.

The Transport (Wales) Act which came into effect in February 2006 gave the National Assembly powers (if not the political will) to plan and co-ordinate an integrated transport system, how much longer do we have to wait to see some vision? In the meantime the rail companies have been busy continuing to ramp up rail fares and attempting to reduce rail services (they have been thwarted in the later endeavour by some well organised local pressure groups in the case of Severn Tunnel and Chepstow in South East Gwent). All of these things have been done with the tacit co-operation of various Westminster Governments and the Department for Transport (in London).

Such duplicity has never been acceptable – it would be nice if the government in Cardiff woke from its self induced slumbers and took the long term view, and actually put its money where its mouth is and work to redevelop our rail services, boost the development of rail freight and to co-ordinate rail and bus services across the whole of Wales. To do this effectively Wales needs to have full control of its transport policy and transport budget devolved as quickly as possible and the franchise when it is renewed in 2017 needs to be run on a not for profit basis.

The creation of a not-for-distributable-profit organisation to run Welsh railways is vital; profits would be available to invest in rail services. This could mean more frequent services in the South Wales valleys, more frequent journeys to West Wales and on the Cambrian line, as well as additional services between the north and south of Wales. This could also mean more investment in new rolling stock to help keep pace with increasing passenger demand.  Now, the clock is ticking as most of the preparatory work for the re-franchising needs to be undertaken during the current Assembly term, so that a delivery model that is better suited to the needs of the people in Wales rather than the shareholders dividend can be developed.

Here in the south east, Abergavenny, Caldicot, Chepstow and Severn Tunnel railway stations should be real local transport hubs, with fully integrated local bus services. Better facilities for passengers are needed and the provision of adequate safe secure parking facilities is urgently required. A feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station west of the town of Usk would benefit local commuters and rail travellers and reduce congestion.

The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads. Such developments would provide a regular rail service to local residents and reduce the ever increasing traffic burden from already overcrowded roads. One real local priority is the completion of the final stage of the rail-link from Ebbw Vale to Newport needs to be completed and railway stations at Caerleon, Llanwern and Magor would all help to reduce road congestion.

Wednesday, 7 November 2012

WORKING FOR SCOTLAND

There are clear signs that the Scottish Government is delivering for Scotland, one example of this took place yesterday when the responsibility for delivering a rail route from the Borders to Edinburgh was been officially passed to Network Rail. Scottish Government Transport Secretary Keith Brown signed the agreement at a ceremony at Newtongrange in Midlothian. The agreement passed responsibility for completing the Borders line, with 30 miles of new track and seven new stations, from Transport Scotland to Network Rail.

Visible progress on the Borders Rail Project
Scottish Government Ministers hope that the £294 million pound project will be completed by the end of 2014, although the contract sets a final deadline of summer 2015. One visible measure of progress is the preparatory work to clear clearing vegetation and removal of buildings and bridges, has already been carried out along the line. Once the project is completed trains return to the Borders for the first time in more than 40 years.

When it comes to the Welsh Government visibly delivering for Wales I struggle to find significant concrete evidence beyond some the transport infrastructure projects brought in by the One Wales Government. Unfortunately for us here in Wales, the Con Dem Westminster Government and the Labour in Wales Government in Cardiff are nominally running the shop. They are not really interested in developing an integrated public transport across the valleys, across the south east and the rest of our country.

Plaid in Monmouth has regularly called for improvements to existing rail services and facilities and a series of feasibility studies to investigate re-opening previously closed railways as has happened in Scotland. In the south east, we need Abergavenny and Chepstow railway stations to be real gateways, with fully integrated local bus services. We need better facilities at Severn Tunnel Junction and Caldicot railway stations and the provision of adequate safe secure parking facilities. We need feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station at Usk.

Driver Training on Gaer Spur in 2009 (Photo: Ian Brewer)
The Welsh Government needs to commit to reopening the final stage of the rail-link from Ebbw Vale to Newport along with new railway stations at Caerleon and Magor which would help to reduce road congestion. Such developments would provide a regular rail service to local residents and reduce the ever increasing traffic burden from already overcrowded roads. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads.

Buying our heads in the sand is not an option, as we face a future where cheap fuel is rapidly becoming a thing of the past. We need to ensure that all our communities have reasonable access to a reliable cheap system of integrated public transport, at the heart of which should be our long neglected rail network. The old excuses about a lack of funding are not acceptable, as even when times were good, there was little evidence of any real commitment or action to improve things here in Wales from Westminster.

A devolutionary half-way house won't work anymore; it will not deliver or even give us the chance to deliver, even with legislative powers. We make up 5% of the population of the UK, and have made (and continue to make) significant contributions to the exchequer.  If Unionists want to the Union to work then we need 5% of the UK transport spend, and full control of our transport planning and our transport budget.

The changes and reforms that are necessary to fix the problems in our country means that we need the tools to do the job. The botched and complicated LCO system for creating legislation barely worked and was consigned to the dustbin of history. The old system did not work with a nominally Labour Government and was never going to work with a Conservative dominated Government which is indifferent to any concept of devolution in particular and the needs of Wales in particular.

Even with legislative powers, we are still in some sort of half devolved limbo state of governance, lacking a fair financial settlement. With all the good wishes in the world this is not going to work well, even with an inert visionless former New Labour government in Cardiff. The governance of Wales if it is to be cost effective can no more be half devolved anymore than someone can be half free.

Wales needs a fair financial settlement so we can finance the construction of a decent system of integrated public transport after years of indifference. In Scotland, significant strides have been made to reopen, redevelop and build a coherent and integrated public transport system. In Wales over the last thirteen years there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (which was partially re-opened on Wednesday 6th February 2008).

Unlike in Scotland there was not real political dynamism at work here, these were administrative rather than legislative projects. In Scotland things were different, bills to reopen old railways were vigorously discussed, debated, scrutinised, amended and duly passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.

The Transport (Wales) Act (effective from February 2006) gave the National Assembly the power to plan and co-ordinate an integrated transport system, how much longer do we have to wait to see some vision let alone any action? Meanwhile the rail companies are busy ramping up rail fares, and trying to reduce services, all with the tacit co-operation of Westminster Government (of various political hues) and the Department for transport.

Such blatant duplicity is not acceptable - it’s time for our government in Cardiff to take the long view and actually put its money where its mouth. The Welsh Government in Cardiff needs to work to redevelop our rail services, boost the development of rail freight and to co-ordinate rail and bus services – because Westminster even with a Labour Government will not deliver for Wales.

Wales needs to have full control of its transport policy and transport budget devolved as quickly as possible and the franchise when it is renewed in 2017 should be run on a not for profit basis.  The time for excuses has passed, ending years of neglect and indifference to our needs won’t be cheap and it won’t be easy as there is no quick fix.

We need to plan for our future but it can be done if the political will is there, as has happened in Scotland. Much can be accomplished by a combination of the will, the funding and interested private and community partners. If the Governments in London and Cardiff are really serious about cutting carbon emissions, reducing road congestion and building sustainable communities then they need to work to get people and heavy goods back onto our railways and revitalise our communities.

Friday, 26 August 2011

THE TIME FOR EXCUSES IS PAST...


When it comes to railways in Wales, we tend to focus on anniversaries of rail closures rather than anniversaries of openings. This may well be because transport policy was something that was done to us rather than done for us. I mention this, because I noticed that a plaque has been unveiled marking the 150th anniversary of the arrival of the railway in Knighton (Powys).

The spectaular 22-mile section of the Heart of Wales line from Craven Arms, Shropshire, to Knighton was constructed in 1861, and manged to avoid being closed in the 1950's and 1960's.  A £5m project which upgraded parts of this rural railway was finished last year, reinstating five passing loops at Knighton, Llandrindod Wells and Llanwrtyd Wells in Powys, and at Llandovery and Llandeilo in Carmarthenshire. This is a small but positive step which could, with extra services lead to more regular and better used trains.

The Con Dem Westminster Government and the New Labour Government in Cardiff need to get serious about developing integrated public transport across the valleys and the south east in Monmouth constituency and beyond. For more than a few years Plaid in Monmouth has called for improvements to existing services and facilities and a series of feasibility studies to investigate re-opening previously closed railways as has happened in Scotland.

We face a future where cheap fuel will be a thing of the past, so we need to ensure that all our communities have reasonable access to a reliable cheap system of integrated public transport, at the heart of which needs to be our long neglected rail network. The old excuses about a lack of funding (despite the banking related financial crisis) are no longer acceptable; Wales making up 5% of the population of the UK, and makes significant contributions to the exchequer over the years - so we need 5% of the UK transport spend, and full control of our transport planning and our transport budget.

A devolutionary half-way house won't work anymore, it will not deliver or even give us the chance to deliver, even with legislative powers. The changes and reforms that are necessary to fix the problems in our country means that we need the tools to do the job. The botched and over complicated LCO system for creating legislation barely worked and has thankfully been consigned to the dustbin of history.

It didn't work with a nominally Labour Government and was never going to work with a Conservative dominated Government which is indifferent to any concept of devolution in particular and the needs of Wales in particular. Even with legislative powers, we are still in some sort of half devolved limbo state of governance, lacking a fair financial settlement. Let's be honest, with all the best will in the world this is not going to work well, even with an inert visionless New Labour government in Cardiff. Governance can no more be half devolved anymore than someone can be half free.

Wales needs a fair financial settlement so we can construct a decent system of integrated public transport. This is what has happened in Scotland, where significant strides have been made to reopen, redevelop and build a coherent and integrated public transport system. In the last twelve years in Wales there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (partially re-opened on Wednesday 6th February 2008).

Being brutally honest these were administrative rather than legislative projects, this has not been thye case in Scotland, where bills to reopen old railways were vigorously debated, scrutinised, amended and passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.

The Transport (Wales) Act which came into effect in February 2006 gave the National Assembly powers to plan and co-ordinate an integrated transport system, how much longer do we have to wait to see some vision? In the meantime the rail companies have been busy ramping up rail fares, attempting to reduce rail services, all with the tacit co-operation of the Westminster Labour Government and the Department for transport (in London).

Such duplicity has never been acceptable - it’s time for our government in Cardiff to take the long term view, to bite the bullet and actually put its money where its mouth is and work to redevelop our rail services, boost the development of rail freight and to co-ordinate rail and bus services across the whole of Wales. To do this effectively Wales needs to have full control of it's transport policy and transport budget devolved as quickly as possible and the franchise when it is renewed in 2017 needs to be run on a not for profit basis.

In the south east , we need Abergavenny and Chepstow railway stations to be real gateways, with fully integrated local bus services. We need better facilities at Severn Tunnel Junction and Caldicot railway stations and the provision of adequate safe secure parking facilities. We need feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station at Usk.

The final stage of the rail-link from Ebbw Vale to Newport needs to be completed and railway stations at Caerleon and Magor would help to reduce road congestion. Such developments would provide a regular rail service to local residents and reduce the ever increasing traffic burden from already overcrowded roads. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads.

If the Governments in London and Cardiff are really serious about cutting carbon emissions and reducing road congestion then we need work to get heavy goods back onto our railways. There is no quick fix, but, the time for excuses is over, we need to plan for the future. This may not be cheap but it can be done if the political will is there, as has happened in Scotland, where there is a useful combination of the will, the funding and interested private partners.

Tuesday, 25 January 2011

ON THE RIGHT LINES

Network Rail is looking at restoring services on the disused Amlwch branch line (on Anglesey) that closed to passenger traffic more than 35 years ago. The old line between Llangefni and Gaerwen shut in 1964 but remained in use for chemical freight until the early 1990s. The four-and-a-half miles (7.2km) of track will be subject to a feasibility study will see engineers looking at 31 bridge and culverts, as well as earthworks on the route. They will also examine the feasibility of refurbishing the Llangefni station building and its disused platform. This is good news - any chance that network Rail can have a look at the old line between Little Mill and Usk, with a view to similar feasibility study?

Monday, 6 December 2010

POSITIVE ABOUT POST OFFICES

News that seven post offices across Gwent will share more than £695,000 funding from the National Assembly is to be welcomed. The Post offices in Abercan, Usk, Henllys, Pentwyn, Bulwark (in Chepstow), Risca, and Corporation Road in Newport will all receive a share of the money, which is aims to help develop and expand their business and provide new services to their communities, under the Post Office Diversification Fund. Another 41 post offices across Wales will also benefit from a share of the money in the near future. This is a positive small step which will help to undo some of the damage inflicted by the previous New Labour and Conservative administrations in past years.

It is worth remembering that between October 2007 and January 2009 around 2,500 Post Offices were closed across the UK, of which 216 Post Offices were closed here in Wales – mostly but not exclusively in rural areas. There were 971 Post Offices (2008 / 2009) in Wales; Post Offices were closed at a faster rate here in Wales than in other areas of the UK, with a 13% reduction in Post Offices in Wales in 2009, which compared to 12.3% in England, 9.75% in Scotland and only 7.61% in Northern Ireland. During the New Labour years some 4,000 Post offices were closed, some 3,000 Post offices were closed by the previous Conservative administration.

Most people and most political parties recognise that Post Offices play a vital roll at the heart of their communities and are real lifelines to vulnerable people. The Post Office Diversification Fund is planned to run for three years and has been set up to offer help and advice with advertising, marketing, business advice, training and setting up new services for customers. The fund can also help with improving access, security and upgrading computer equipment, etc. This is the result of a Plaid driven One Wales Government helping to deliver improvements to important services in our communities, which makes a pleasant change by way of comparison with recent Westminster Governments.

Sunday, 21 November 2010

REACTING TO CONSEQUENCES

One of the consequences of the Comprehensive Spending Review, may well be that the proposed £1.1 billion pound Swansea to London rail electrification project bites the dust. Plaid's Ieuan Wyn Jones successfully negotiated the multi-million pound the extension of the proposed upgrade and electrification of the rail line between Swansea and London last year. The original electrification project was (as proposed by New Labour) was only intended to extend as far as Bristol, and only after the intervention of the Plaid driven One Wales Government did they agreed to electrify the line as far as Swansea.

The silence from the ConDem Government in Westminster, in relation to the fate of this project could at best be described as evasive or at worst described as telling when it comes to committing to the extending the electrification programme into Wales - so much for Wales being a ConDem priority. There has been plenty of financial white smoke from the Treasury, but, as yet no clear answer either way.

Here are some statistics to think about:

Electrified Rail in Europe


Switzerland: 100%
Sweden: 77%
Netherlands: 73%
Italy: 69%
Germany: 56%
Spain: 56%
UK: 40%

Source: UIC Website: http://uic.asso.fr

Electrified Rail in Wales (After 13 years of New Labour Government).


Wales: 0%

I think that we are too focused on the rail link to London, which has long needed electrification, it's far too easy to end up endlessly complaining about how Wales is left out of this, fails to get that, etc. Wales is unfairly funded - fact. Let's move on, and see what we can achieve with what we have got. The Con Dem's are unlikely, no matter how well reasoned the case is and no matter how well explained the arguments are, not going to change their mind or their position in relation to fair funding for Wales.

So lets' get practical, let's give some real and serious consideration be given to electrifying the valley lines down to the coastal belt. What we are talking about is the Ebbw Vale to Cardiff (and eventually to Newport) line, the lines in Western Gwent, the lines down from Rhondda, Cynon and Taff Valleys to Cardiff and lines into Swansea and Bridgend.

Now if we use part of WAG's Annual Transport budget, which comes in at around £0.76 billion. If we make creative use of European matched funding then we could be talking about doing the business. Sion Barry (in the Western Mail 24th September 2010) estimated that some £200 million would pay for the electrification of the valley lines into Cardiff. Liverpool has long had an electrified rail link to London and has scarcely benefited from it. We can do the London link later, lets do something lasting for our Valley communities and lets look doing it now.

We also need to look at reopening old railway lines, feasibility studies into the possibilities of reopening to old railway lines (between Llangefni on Anglesey and Bangor, and between Aberdare and Hirwaun in the Cynon valley) to passenger traffic have already been called for from Network Rail. Similar feasibility studies need to be undertaken on the old railway lines between Usk via Little Mill to the main line and in the Wye Valley between Chepstow and Monmouth.

If we are serious about delivering reliable, effective and sustainable all weather communications to our communities then reopening old railway lines initially to passenger and then to rail freight is the way to go. These lines to Usk and to Monmouth via Chepstow which were originally closed by the then Conservative Government which initiated significant and damaging cuts to rail services via the Beeching review of rail transport.

If Government in both London and Cardiff is really serious about cutting carbon emissions and road congestion then reopening these lines to rail and fright traffic could provide serious economic stimulation to the local economies and provide a real opportunity for people to make use of public transport which would reduce road congestion. Let's get to work.

Friday, 12 November 2010

USK POST OFFICE

The news from the Royal Mail that it intends to close the Usk sorting office next year will not only mean a relocation of the workforce to Pontypool as of January 2011, but also shows that particularly if the manner of the announcement is repeated across Wales over the next few years that there is little or no concern for our local communities. It's apparent that the Royal Mail has already made its mind up and I concerned that whatever coherent case is made against closure the Royal Mail will merely pay lip service to it, go through the motions and then merrily press on.

Monmouthshire is a relatively large county and the closure of the office in Usk will lead to a poorer service for the public, especially in rural areas. The Royal Mail has said the closure was a commercial decision yet it has refused to say how much money would be saved by this move to Pontypool. So much for transparency - as far as I can recall (despite the desires of the Conservative and Liberal Democrat Government) the Royal Mail is still publicly owned so should come clean with the details of any savings that are being made.

Thursday, 29 July 2010

ROADS AND BRIDGES AND RAIL FREIGHT

News that the residents concerns about the noise and pollution levels caused by HGV's vehicles (on the A472) taking a short cut through the centre of Usk, while being of importance are nothing new. As a Trainee journalist on the Pontypool Free Press, I can recall this problem was a contentious issue in the late 1980's. Gwent Police, Monmouthshire council (the nominal successor to Gwent County Council in Usk at least) and Usk town council are still trying to resolve this problem.

I also remember that in the late 1980's a by-pass was offered by developers, controversially linked to proposed plans to build large amounts of housing in and around the town. This proposed development caused some controversy and headlines and letters in the Free Press at least at the time, but, nothing (and rightly so in my opinion)came of it.

The problem has not gone away, it's even worse than it used to be, as over the last twenty years the HGV's have got larger and far more frequent and damage is being done to Usk (and the river bridge) not to mention the increase in noise and pollution in the town, which affects residents, something that will also help to deter visitors to the town. The current 7.5 tonnes weight limit warmings which are being regularly flouted and any resultant fines are not working.

Most people know that there are periodic exceptions to the weight limit and the road traffic orders restricting weight limits are difficult to enforce. The short cut through Usk (from the A449) avoids using the A40 from Raglan to Abergavenny and the A4042 which has well known traffic related problems of its own, to save a few miles. The use of Sat-navs also causes problems by directing lorries through the town
rather than alternative routes.

The issue continues to rightly generate more than reasonable concerns amongst the residents of Usk, there have been recent and not so recent public meetings to address public concerns about the bridge and air pollution in the town. A number of different solutions have been proposed over the years, but, in truth nothing has been done to solve the problem.

The bad news is with the UK Government looking to make significant savings to its capital expenditure programme (which will be passed on down the line to the National Assembly in Cardiff and our local authorities) any suggestion of a by-pass will be a non starter. Even over the short term, with extra police patrols and road blocks may not necessarily survive the cost cutting that's going to descend upon Gwent Police (and the other forces in Wales).

There are not quick fixes, and no easy answers, one thing we need to do is get freight back onto rail and off our roads, far too much freight is being moved long distances by HGV's along roads which are entirely unsuitable for such volumes of traffic. This is one side effect of the wholesale butchery of our rail network in the 1950's and 1960's.

If Government in both London and Cardiff is really serious about cutting carbon emissions and reducing road congestion then much more emphasis on getting heavy goods back onto our railways, Now lets be honest this is not a quick fix and it may not be cheap but it can be done if the political will is there, as has happened in Scotland, where there is a useful combination of the will, the funding and interested private partners.

Tuesday, 30 March 2010

THINK DIFFERENT - INVEST IN RAIL

The National Assembly’s recent commitment to finish the work on Gaer junction, so that direct trains can run between Newport and Ebbw Vale is to be warmly welcomed, along with a possible new railway station in Ebbw Vale town centre and an hourly service. Much more obviously needs to be done, and despite the threat of potential or immanent cuts, there is much that can be done to improve our rail services.

There is a need for railway station's at Caerleon and Magor and consideration should be given to reopening the line to Usk from Little Mill, There have been improvements at Severn Tunnel Junction, there is room for improvements in facilities and access at Caldicot, Chepstow and Abergavenny Stations, not to mention more frequent stopping services.

We also need get freight off the roads and onto the rails which would along with rail electrification cut both pollution and road congestion. If Government wants to change the way we use public transport when we need a public transport system that’s fit for purpose and fit for us to use.

Friday, 5 February 2010

THE POST OFFICE

The cold statistics will tell you that between October 2007 and January 2009 around 2,500 Post Offices were closed across the UK, of which 216 Post Offices were closed here in Wales – mostly but not exclusively in rural areas. There are 971 Post Offices (2008 / 2009) in Wales; Post Offices have been closing at a faster rate here in Wales than in other areas of the UK, with a 13% reduction in Post Offices in Wales last year, compared to 12.3% in England, 9.75% in Scotland and only 7.61% in Northern Ireland.It is worth remembering that since New Labour come to power in 1997, some 4,000 Post offices have been closed, some 3,000 Post offices were closed by the previous Conservative administration.

Post Office Ltd can say that its closure programme affected less than 1% of the population and that they aimed to improve the ranges of services offered to customers, make their branches more viable, etc. Research for the report from focus groups around Wales, showed that people want their local Post Offices to stay open and that people wanted a personal face-to-face service in their local community, rather than having to access services on-line or over via the phone.

A Consumer Focus Wales report revealed that older consumers who were forced to move to another post office complained about experiencing longer queues and an impersonal service. The report noted that those with health problems found it difficult to queue for long periods or to walk the extra distance to the new post office without assistance. It was also noted that the closure of the local post office led to far fewer opportunities for social interaction, with people reporting an increase in isolation and loneliness. Rural and small town Post Offices play a very important role in our communities which goes well beyond the provision of postal services. It is important that all essential local Post Office services can be easily accessed locally by older people within their own communities.

Let’s not forget that Labour Ministers and backbench MPs in Westminster (Wayne David [Caerphilly], Jessica Morden [Newport East] to name but two) happily voted in favour of the closure of Post Offices, whilst at the same time pretended to campaign in their constituencies in favour of keeping threatened Post Offices open. They may or may not have considered the full implication the on-going programme of Post Office closures as they trooped obediently through the voting lobbies at Westminster before the vote – perhaps not!

When Polling Day comes the electors should not forgive or forget this government’s (or the previous Conservative governments) role in decimating our Post Office network, if the rundown of our rural and small town Post Offices continues and more are forced to close down then many thousands of more vulnerable older people could become more isolated from the local community in our urban and rural areas. There is a need for Post Offices to modernise to make them more financially viable, but, it is important to remember that this Labour Government began closing the Post Offices without adequately exploring how Post Offices could expand their services and was merely following the line adopted by the previous Conservative Governments.

IT does not have to be this way, recently In Monouthshire Usk, Caldicot and Magor post offices were 3 out of the 75 post offices across Wales to be awarded grants from the Post Office Diversification Fund. Most people and most political parties recognise that Post Offices play a vital roll at the heart of their communities and are real lifelines to vulnerable people.

The Post Office Diversification Fund is planned to run for three years and has been set up to offer help and advice with advertising, marketing, business advice, training and setting up new services for customers. The fund can also help with improving access, security and upgrading computer equipment, etc. This is the Plaid driven One Wales Government helping to deliver improvements to important services in our communities, which makes a pleasant change by way of comparison with recent Westminster Governments.

Sunday, 29 November 2009

TIME TO REOPEN OUR OLD RAILWAYS

The news that the Plaid driven One Wales Government has asked Network Rail to conduct feasibility studies into the possibilities of reopening to old railway lines (between Llangefni on Anglesey and Bangor, and between Aberdare and Hirwaun in the Cynon valley) to passenger traffic is to be welcomed.

Similar feasibility studies should be undertaken on the old railway lines between Usk via Little Mill to the main line and in the Wye Valley between Chepstow and Monmouth. If we are serious about delivering reliable, effective and sustainable all weather communications to our communities then reopening old railway lines initially to passenger and then to rail freight is the way to go.

The lines to Usk and to Monmouth via Chepstow which were originally closed by the then Conservative Government which initiated significant and damaging cuts to rail services via the Beeching review of rail transport.

If Government in both London and Cardiff is really serious about cutting carbon emissions and road congestion then reopening these lines to rail and fright traffic could provide serious economic stimulation to the local economies and provide a real opportunity for people to make use of public transport which would reduce road congestion.

Tuesday, 3 November 2009

GWENT POLICE STATION CLOSURES

The news that a number of Police stations in Gwent could be closed by the end of March 2012; under the Police Authority’s “reprovision programme” which is under consideration by the police authority is shocking and may prove to be unacceptable to most reasonably minded people.

Equally unacceptable is the ludicrous suggestion, which proposes the replacement of the Police Stations in Caldicot, Usk and Monmouth with ‘mobile’ police stations. This is, I suspect a clear case of Gwent Police and Gwent Police Authority dancing to a Ministry of Justice budget reducing tune.

The people of Gwent are already receiving a patchy service in places, with some Police stations only being open for limited hours during the day. Such a proposal is ludicrous - people need to feel secure in their communities and closing these Police stations will not help at all - far from it , it will merely send the wrong message.

This will not help the fight against crime and is a very short-term short sighted decision that the people of Gwent and Gwent Police Authority may come to regret sooner rather than later.