Showing posts with label Caerleon. Show all posts
Showing posts with label Caerleon. Show all posts

Monday, 23 February 2015

GIVING GOVERNMENT A NUDGE!

The grim reality is that by the time we get to Polling Day (in May) we will be 40% through the planned Con Dem Coalition Governments austerity programme of public sector cuts, which means that we have another 60% of cuts to follow. Austerity hits in so many people in so many different ways, yet almost unnoticed it has also changed what ‘Government’ at various levels actually offers to do for us. 

The future trend is for Government at all levels to simply be there and to provide nothing or at least next to nothing for this costs the least if it can get away with it. The big society has quietly been ditched (along with the photo opps with the huskies) and despite the spin the new bottom line, particularly when you have ineffective and inert Government, is focused intense campaigning to get things done. 

If we want to get something done that government won’t provide then we will have to fight for it like we have never fought before. If we want regeneration, decent facilities in our towns and communities or want to reopen an old railway station then we have to make Government act on our behalf, whether it wants to or not.

Small-scale local transport projects and well-organised local campaigns may provide the best opportunity to make a real difference when it comes to reopening or improving the services of our railway stations. There are plenty of good examples of successful campaigning groups to follow; including the Carno Station Action Group, the Severn Tunnel Action Group have campaigned to restore rail services and improvements in the passenger infrastructure, Better Trains 4 Chepstow who are campaigning amongst other things for more stopping services at Chepstow, and the campaign for a railway station at Magor.

Locally our rail network remains unconnected in so many ways, with the tantalising possibilities of small changes delivering big wins. The final stage of the rail-link from Ebbw Vale to Newport needs to be completed and railway stations at Caerleon and Magor would help to reduce road congestion and enable commuters to get to work in Cardiff, Bristol and other nearby destinations.

Such developments would provide a regular rail service to local residents and reduce the ever-increasing traffic burden from already overcrowded roads. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads.

We should nudge our government to commission feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the old line from Little Mill to Usk and the development of a new railway station at Usk. We need Abergavenny and Chepstow railway stations to be real gateway stations; with integrated local bus services and the provision of more and cheaper safe secure parking. We still need better facilities at Severn Tunnel Junction and Caldicot railway stations and the provision of adequate safe secure parking facilities.

Sunday, 17 November 2013

SMALL RAIL SUCCESSES WIN BIG

Many of our existing railway stations suffer from some pretty significant gaps in services, so are underused. The future trend is merely for Government at all levels to simply be there and to provide nothing or at least next to nothing for this costs the least. The new bottom line, being when you have ineffective and inert Government, is that if we want a civic society or want to reopen an old railway station then we have to make Government act on our behalf, whether it wants to or not.

Small scale local transport projects and well organised local campaigns may provide the best opportunity to make a real difference when it comes to reopening or improving the services of our railway stations. There are a number of good examples to follow; including the Carno Station Action Group, the Severn Tunnel Action Group who have campaigned to restore rail services and improvements in the passenger infrastructure, Better Trains 4 Chepstow who are campaigning amongst other things for more stopping services at Chepstow, and the campaign for a railway station at Magor.

Driver Training on Gaer Spur in 2009 (Photo: Ian Brewer)
The final stage of the rail-link from Ebbw Vale to Newport needs to be completed and railway stations at Caerleon and Magor would help to reduce road congestion. Such developments would provide a regular rail service to local residents and reduce the ever increasing traffic burden from already overcrowded roads. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads.


In the south east, we need Abergavenny and Chepstow railway stations to be real gateway stations, with fully integrated local bus services and more safe secure parking. We need better facilities at Severn Tunnel Junction and Caldicot railway stations and the provision of adequate safe secure parking facilities. We need feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the old line from Little Mill to Usk and the development of a new railway station at Usk.

Monday, 12 August 2013

MAKING PLANS

The regional transport consortium Sewta, the South East Wales Transport Alliance, has launched a consultation on how it thinks services should be improved in the region up to 2030. New services are proposed for the Ebbw Valley line and new stations in south Gwent at Caerleon, St Mellons, Coedkernew and Llanwern, along with additional rail services across the south east. Proposals for the Ebbw Vale line include  extensions from Ebbw Vale Parkway to Ebbw Vale Town, from Llanhilleth to Abertillery and from the Ebbw Vale line to Newport as well as new stations at Crumlin and Pye Corner in Newport.

Under the SEWTA proposals additional services would also call at Severn Tunnel Junction along with new services being proposed on the Abergavenny and Chepstow line, and services between Caerphilly, Machen and Newport. A suggestion has also been made to electrify the Abergavenny to Shrewsbury and Chepstow to Gloucester lines. The plans also include the extension of the railway to Ebbw Vale Town and plans to build a new station at Pye Corner which has already have Welsh Government backing.

The capital costs are estimated for the schemes within the programme average £19.5m per annum. Revenue costs would increase over the initial ten years of the strategy to between £13m and £15m per year. Thereafter, increasing revenues would offset additional costs. The majority of that benefit occurs in 2020, when electrification will reduce operating costs. Sewta is a consortium made up of local authorities in the south east including all five Gwent councils, so the projects would need funding from other sources and evidence of support is being sought for the concept of a South East Wales Metro.

The closing date for comments is September 30th 2013

For more information visit www.sewta.gov.uk 


Friday, 17 May 2013

THE CASE FOR FORWARD THINKING?

I welcome the news that funding has been secured for new railway station at Pye Corner, on the line between Cardiff and Ebbw Vale after the UK government awarded the scheme some £ 2.5 million pounds. The new station which will include a a single platform and a car park with 70 spaces should be up and running by the end of 2014, in time for the Ebbw Vale line's planned electrification. This follows last week’s announcement that £ 11.5 million pounds worth of funding has been earmarked for the new Ebbw Vale Town rail station. The Ebbw Vale Town station will also be a single platform at the Works, on the redeveloped steelworks site. The Ebbw Vale line has been re-opened since 2008 and is among the south Wales valleys and commuter lines to be electrified sometime between 2014 and 2019 as part of a £350m investment.

A simple question - single track?
Putting to one side the as yet restored rail link into Newport (not to mention the need for new stations at Caerleon, Llanwern and Magor) for the moment, this is good, if belated news. I continue to question the decision to build single platform railway stations (save where the track is doubled from Crosskeys to Risca). This decision has and continues to directly impact on the frequency of the rail services that can be run, without double platforms and passing loops at all of the station on the line, we are talking about a relatively reduced up and down rail service.  If I was being generous I might suggest that it might be case of Network Rail and the Labour in Wales Government in Cardiff bay thinking along the lines of ‘Give them that [limited service], they will be grateful as something is better than nothing’.

Or double track?
At some point I have little doubt that we (the tax payers) will have to fork out the cash to build double platforms and passing loops along the length of the Ebbw Vale line if only to upgrade the infrastructure and ensure a far more regular service. I find this basic lack of common sense and even basic foresight quite disturbing, if would have been far more sensible to restore the whole line to double track working from the start. That said, the new stations at Pye Corner and in Ebbw Vale are a gain, but, why not build them with double platforms  - it will save us all time and money later.

Thursday, 16 May 2013

HOW BIG A 'NO' DO YOU WANT?

The Sainsbury’s Local supermarket in the village of Caerleon at the site of the Angel Hotel on Goldcroft Common will open before Christmas, and according to the developer will create up to 25 jobs. The demolition of the Angel Hotel is proceeding and construction work is due to begin shortly on the new supermarket, which will have  a footfall of some 385 square metres (with ten parking spaces to the rear).

A work in progress - the site of the Angel
Just after the City Council elections in May last year, the new Labour dominated quietly approved a request from council planning officials to recommend that Sainsbury’s plan to convert the Angel Hotel in Caerleon into a convenience store be approved. The proposals which had been put forward by Hillvale Properties who operated on behalf of Sainsbury’s prompted over 1,700 people to sign petitions against it, and 127 neighbours to write letters of objection.  

Local people told the council that the plan to turn the pub, located on Goldcroft Common, Caerleon, into a 385 square metre retailer with two flats on the first floor would “exacerbate an already dangerous and difficult traffic situation”. Concerns were raised that local shops – several independent retailers including a sandwich shop and a Spar are nearby – would close, while the petition said the historical character and sense of community in Caerleon would be tarnished.

There are also concerns about anti-social behaviour, noise to residents, and parking which is claimed is already at saturation point in the area. As someone who periodically travels on the bus to and from work past the Angel, parking can at times be grim in and around the area of the Angel and traffic congestion is a real  issue.

For reasons beholden unto themselves City planners noted that a new store opening would “enhance” the Caerleon district centre, add to its “retail floorspace” and suggested that the store was unlikely to harm the village centre’s viability. The planners duly noted that the Spar and Pipers News shops may lose trade, but “it is not the role of the planning system to restrict competition”.  This may well be a fair point but what about any real investigation into the economic impact of the development on the village?

The planner had also noted that traffic concerns were “understandable”, but had added “there is no robust evidence” that the proposal would result in “a significant and harmful increase in traffic.” Spaces for seven customer cars during deliveries would meet parking requirements, and Gwent Police had raised no objection to the proposal. The planners had also called for conditions imposing restricted delivery hours.

The recommendation was to proceed with the application, despite any local objections. One question that should be loudly asked is just who is the planning system serving, clearly not the expressed wishes of the residents of Caerleon. I have no doubt that if the City Councillors vote down the proposed development that they will be told that the developer will appeal and keep appealing until they get the result they want and that this will cost a small fortune.

Now, none of this is new, the larger food retailers are systematically targeting the small shopping areas across Wales and the rest of the UK as they aggressively seek every greater profits and a larger market share. If this development goes a head the medium to long term impact on Caerleon will be a loss of trade, jobs and customer choice.  This is not the first time that this has happened in Newport, and it will not be the last.

Back in June 2011  Tesco won their appeal against an initial decision to turn down planning permission for a new store.  Over 500 people had objected to Tesco plans to open an Express store in a dis-used pub, the Black Horse Inn on Somerton Road. The Council planning officers had on that occasion recommended that the application be refused over concerns about congestion and road safety issues and a lack of parking provision.

Local residents also objected on grounds of the impact of the development on existing shops. The Council's planning committee considered the application on 1st April 2009 and rejected the plans. The then planning committee recommended refusal on three grounds - that it would be detrimental to the vitality and viability of nearby retail centres; insufficient parking; substandard access.

The Planning Inspectorate however allowed Tesco to appeal to convert the former Black Horse Inn pub on Somerton Road into an Express store. The Tesco PR machine no doubt rolled out the usual claptrap about creating jobs and boosting the local economy , here should have been little doubt that the planned new Tesco Express store in Somerton, is part of an aggressive business strategy expressly targeting local shops and small businesses in local shopping areas, with a view to taking their trade. This is part of a recognised problem which is taking place across Wales and which does not just relate to Tesco but most of the other larger UK wide retail chains.

The Federation of Small Businesses (FSB) has long noted that the UK loses approximately 2,000 local shops every year and should this continue then by 2015 there will be no independent retailers left in business, something that effects consumers and communities as they effectively lose any real choice in the marketplace. Over recent years across all of Wales, that particularly useful mix of local shops, small businesses and local suppliers have come under increasing pressure as the usual suspects in the shape of “identikit” chain stores have replicated themselves across our towns.

Our planning process has been fundamentally weakened and effectively undermined, as local authorities fear the cost implications of supermarket applications being taken to appeal after appeal if the original outline planning permission is refused. We are proceeding down a slippery slope, when Councillors end up being advised by their officers to grant planning permission less the potential costs of refusing a development proposal from a large company prove to damaging - so much for local democracy!

Wednesday, 7 November 2012

WORKING FOR SCOTLAND

There are clear signs that the Scottish Government is delivering for Scotland, one example of this took place yesterday when the responsibility for delivering a rail route from the Borders to Edinburgh was been officially passed to Network Rail. Scottish Government Transport Secretary Keith Brown signed the agreement at a ceremony at Newtongrange in Midlothian. The agreement passed responsibility for completing the Borders line, with 30 miles of new track and seven new stations, from Transport Scotland to Network Rail.

Visible progress on the Borders Rail Project
Scottish Government Ministers hope that the £294 million pound project will be completed by the end of 2014, although the contract sets a final deadline of summer 2015. One visible measure of progress is the preparatory work to clear clearing vegetation and removal of buildings and bridges, has already been carried out along the line. Once the project is completed trains return to the Borders for the first time in more than 40 years.

When it comes to the Welsh Government visibly delivering for Wales I struggle to find significant concrete evidence beyond some the transport infrastructure projects brought in by the One Wales Government. Unfortunately for us here in Wales, the Con Dem Westminster Government and the Labour in Wales Government in Cardiff are nominally running the shop. They are not really interested in developing an integrated public transport across the valleys, across the south east and the rest of our country.

Plaid in Monmouth has regularly called for improvements to existing rail services and facilities and a series of feasibility studies to investigate re-opening previously closed railways as has happened in Scotland. In the south east, we need Abergavenny and Chepstow railway stations to be real gateways, with fully integrated local bus services. We need better facilities at Severn Tunnel Junction and Caldicot railway stations and the provision of adequate safe secure parking facilities. We need feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station at Usk.

Driver Training on Gaer Spur in 2009 (Photo: Ian Brewer)
The Welsh Government needs to commit to reopening the final stage of the rail-link from Ebbw Vale to Newport along with new railway stations at Caerleon and Magor which would help to reduce road congestion. Such developments would provide a regular rail service to local residents and reduce the ever increasing traffic burden from already overcrowded roads. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads.

Buying our heads in the sand is not an option, as we face a future where cheap fuel is rapidly becoming a thing of the past. We need to ensure that all our communities have reasonable access to a reliable cheap system of integrated public transport, at the heart of which should be our long neglected rail network. The old excuses about a lack of funding are not acceptable, as even when times were good, there was little evidence of any real commitment or action to improve things here in Wales from Westminster.

A devolutionary half-way house won't work anymore; it will not deliver or even give us the chance to deliver, even with legislative powers. We make up 5% of the population of the UK, and have made (and continue to make) significant contributions to the exchequer.  If Unionists want to the Union to work then we need 5% of the UK transport spend, and full control of our transport planning and our transport budget.

The changes and reforms that are necessary to fix the problems in our country means that we need the tools to do the job. The botched and complicated LCO system for creating legislation barely worked and was consigned to the dustbin of history. The old system did not work with a nominally Labour Government and was never going to work with a Conservative dominated Government which is indifferent to any concept of devolution in particular and the needs of Wales in particular.

Even with legislative powers, we are still in some sort of half devolved limbo state of governance, lacking a fair financial settlement. With all the good wishes in the world this is not going to work well, even with an inert visionless former New Labour government in Cardiff. The governance of Wales if it is to be cost effective can no more be half devolved anymore than someone can be half free.

Wales needs a fair financial settlement so we can finance the construction of a decent system of integrated public transport after years of indifference. In Scotland, significant strides have been made to reopen, redevelop and build a coherent and integrated public transport system. In Wales over the last thirteen years there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (which was partially re-opened on Wednesday 6th February 2008).

Unlike in Scotland there was not real political dynamism at work here, these were administrative rather than legislative projects. In Scotland things were different, bills to reopen old railways were vigorously discussed, debated, scrutinised, amended and duly passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.

The Transport (Wales) Act (effective from February 2006) gave the National Assembly the power to plan and co-ordinate an integrated transport system, how much longer do we have to wait to see some vision let alone any action? Meanwhile the rail companies are busy ramping up rail fares, and trying to reduce services, all with the tacit co-operation of Westminster Government (of various political hues) and the Department for transport.

Such blatant duplicity is not acceptable - it’s time for our government in Cardiff to take the long view and actually put its money where its mouth. The Welsh Government in Cardiff needs to work to redevelop our rail services, boost the development of rail freight and to co-ordinate rail and bus services – because Westminster even with a Labour Government will not deliver for Wales.

Wales needs to have full control of its transport policy and transport budget devolved as quickly as possible and the franchise when it is renewed in 2017 should be run on a not for profit basis.  The time for excuses has passed, ending years of neglect and indifference to our needs won’t be cheap and it won’t be easy as there is no quick fix.

We need to plan for our future but it can be done if the political will is there, as has happened in Scotland. Much can be accomplished by a combination of the will, the funding and interested private and community partners. If the Governments in London and Cardiff are really serious about cutting carbon emissions, reducing road congestion and building sustainable communities then they need to work to get people and heavy goods back onto our railways and revitalise our communities.

Wednesday, 25 July 2012

A GLOBAL NOT A LOCAL BANK

Customers of Caerleon’s HSBC branch are angry following the announcement that the bank will close its branch in Backhall Street on the 2nd November 2012. HSBC stated that the branch is currently only open for limited hours during the week and HSBC is deciding whether or not to leave a cash machine on the site after the banks closure.

The South Wales Argus noted that a campaign to save Caerleon’s only bank from closure is mounting as hundreds of people sign a petition against the move on Friday (20th July), which has filled 14 pages’ worth of signatures. HSBC has already closed the next nearest branch to Caerleon, on Caerleon Road, St Julian’s, in June 2011.

As of March 2012, some twenty One communities in Wales had no bank, and forty seven have only got one bank, says the Campaign for Community Banking Services. The problem of closing banks affects all parts of Wales, while it is more readily identifiable in rural communities; it also affects our urban areas as well.

HSBC is closing its branches across Wales - Presteigne, which was closed on Friday 9th March 2012 (despite over 500 people signed a petition against the closure of the Presteigne branch), and in Blaenafon (where over a 1,000 people signed a petition against the planned closure of the last bank in the town), Torfaen, closed on the 11th May. HSBC says that both banks have seen a significant decline in the numbers of customers using their services and are no longer commercially viable.

Campaigners rightly claim that businesses in the area will suffer and that residents (especially the elderly) who are reliant on public transport to bank in a nearby town will be disadvantaged. Just for the record HSBC (March 12th 2012) had closed six branches in Wales between last September and December 2011, including Llandysul, Ceredigion, and Llanrhaeadr-ym-Mochnant in Powys. The company has closed 17 "under-used" banks in Wales since 2009 in urban and rural areas.

Both HSBC, Barclays and the rest have been quietly closing small rural banks in recent months, and NatWest plans to cut opening hours. The British Bankers' Association says more customers now go on-line and banks must examine branch running costs.

Despite the spin this is about nothing more than cutting running costs, the banks have little (or no concern) for their customers or the concerns of the customers or their communities. As noted by the US Senate, some banks have other more pressing interests than those of their domestic customers like helping to launder money for drug dealers, dictators and terrorists, so much for being a local bank.

Sunday, 8 July 2012

SUPERMARKET SWEEP?

News that Labour run Newport City Council approved plans to convert a pub into a small Sainsbury’s in Caerleon will sadly shock very few interested observers. Opponents of the development were disappointed by the decision by Newport planning committee to allow the conversion of the Angel Hotel on Goldcroft Common, Caerleon. One of the reason as to why the application was approved may well have been the concern that the developer would appeal if the planning committee threw out the application.

Council Officers and a sub-committee of planning councillors had visited the Caerleon site but recommended Hillvale Properties Ltd’s plans for a Sainsbury’s be approved. Over 1,700 signatures were collected for a petition against the move, along with 128 letters of objection were sent to the council. Some 66 postcards, distributed by Sainsbury’s to local residents, were received in support.

Newport City Council has recently lost appeals against a decision not to give planning permission for a site in Rogerstone to be redeveloped for a Tesco Express store following a planning inquiry in 2008 and plans to convert the former Black Horse Inn pub on Somerton Road into a Tesco Express store over in Somerton. Despite the Council’s and local people’s concerns and objections, the Planning Inspectorate allowed Tesco to appeal.

It is worth noting that the Federation of Small Businesses (FSB) has previously noted that the UK loses around 2,000 local shops each year and if this continue then by 2015 there will be no independent retailers left in business. Over recent years across all of Wales, that particularly useful mix of local shops, small businesses and local suppliers have come under increasing pressure as the usual suspects in the shape of “identikit” chain stores have replicated themselves across our towns.

The bottom line is that our planning process has been weakened and undermined, as local authorities fear the cost implications of supermarket applications being taken to appeal after appeal if the original outline planning permission is refused. We are not far away from the point where Councillors will be advised by their officers to grant planning permission less the potential costs of refusing a development proposal from a large company prove to damaging – at which point an part of our local democratic system will have quietly died.

Saturday, 28 April 2012

PUB = SUPERMARKET

Newport City Councillors have delayed making a decision on the controversial plan to convert a Caerleon pub into a convenience store (Sainsbury's) so that councillors to make a site visit. Planning Committee members mirrored hundreds of residents concerns about proposals to turn the Angel Hotel into a Sainsbury’s would create traffic and air pollution problems. The site visit will take place in June and any difficult decision will be made after the council elections on May 3rd.

Wednesday, 25 April 2012

WHEN A COMMUNITY SAYS ‘NO’ ?

Newport council planning officials have recommend that Sainsbury’s plan to convert the Angel Hotel in Caerleon into a convenience store be approved with conditions by the city’s planning committee when it meets on Wednesday (25th April). The proposals (put forward by Hillvale Properties who are operating on behalf of Sainsbury’s) have prompted over 1,700 people to sign petitions against it, and 127 neighbours have written letters of objection.

Local people have told the council that the plan to turn the pub, located on Goldcroft Common, Caerleon, into a 385 square metre retailer with two flats on the first floor would “exacerbate an already dangerous and difficult traffic situation”. Concerns were raised that local shops – several independent retailers including a sandwich shop and a Spar are nearby – would close, while the petition said the historical character and sense of community in Caerleon would be tarnished.

There are also concerns about anti-social behaviour, noise to residents, and parking which is claimed is already at saturation point in the area. As someone who travels on the bus to and from work past the Angel and parking is grim in and around the area of the Angel and traffic congestion a real issues, at least from where I am sat on bus.

City planners however, noted that a new store opening would “enhance” the Caerleon district centre, adding to its “retail floorspace”, and the store is unlikely to harm the centre’s viability. The planners noted that the Spar and Pipers News shops may lose trade, but “it is not the role of the planning system to restrict competition”. A fair point but what about the investigation into the economic impact of the development on the village?

Planners noted that traffic concerns were “understandable”, but adds “there is no robust evidence” that the proposal will result in “a significant and harmful increase in traffic.” Spaces for seven customer cars during deliveries would meet parking requirements, and Gwent Police had raised no objection to the proposal. Planners have called for conditions imposing restricted delivery hours.

The recommendation is to proceed with the application, despite local objections. One question that should be loudly asked is just who is the planning system serving, clearly not the expressed wishes of the residents of Caerleon. I have no doubt that if the City Councillors vote down the proposed development that they will be told that the developer will appeal and keep appealing until they get the result they want and that this will cost a small fortune.

Now, none of this is new, the larger food retailers are systematically targeting the small shopping areas across the UK as they seek every greater profits and a larger market share. If this development goes a head the medium to long term impact on Caerleon will be a loss of trade, jobs and customer choice. This is not the first time that this has happened in Newport, and it will not be the last.

Back in June 2011 Tesco won their appeal against an initial decision to turn down planning permission for a new store. Over 500 people had objected to Tesco plans to open an Express store in a dis-used pub, the Black Horse Inn on Somerton Road. The Council planning officers had on that occasion recommended that the application be refused over concerns about congestion and road safety issues and a lack of parking provision.

Local residents also objected on grounds of the impact of the development on existing shops. The Council's planning committee considered the application on 1st April 2009 and rejected the plans. The committee recommended refusal on three grounds - that it would be detrimental to the vitality and viability of nearby retail centres; insufficient parking; substandard access.

The Planning Inspectorate however allowed Tesco to appeal to convert the former Black Horse Inn pub on Somerton Road into an Express store. The Tesco PR machine no doubt rolled out the usual claptrap about creating jobs and boosting the local economy, here should have been little doubt that the planned new Tesco Express store in Somerton, is part of an aggressive business strategy expressly targeting local shops and small businesses in local shopping areas, with a view to taking their trade. This is part of a recognised problem which is taking place across Wales and which does not just relate to Tesco but most of the other larger UK wide retail chains.

The Federation of Small Businesses (FSB) has noted that the UK loses approximately 2,000 local shops every year and should this continue then by 2015 there will be no independent retailers left in business, something that effects consumers and communities as they effectively lose any real choice in the marketplace. Over recent years across all of Wales, that particularly useful mix of local shops, small businesses and local suppliers have come under increasing pressure as the usual suspects in the shape of “identikit” chain stores have replicated themselves across our towns.

Our planning process has been fundamentally weakened and undermined, as local authorities fear the cost implications of supermarket applications being taken to appeal after appeal if the original outline planning permission is refused. We are on a slippery slope, when Councillors may be advised by their officers to grant planning permission less the potential costs of refusing a development proposal from a large company prove to damaging - so much for local democracy!

Tuesday, 7 February 2012

HAVING OUR SAY?

The South East Wales Transport Alliance (SEWTA) is canvassing our opinions on its report (from March 2011) that looks at improvements to rail provision along the Abergavenny to Newport line. The report includes proposals for a new railway station at Caerleon and improvements to existing stations at Abergavenny, Pontypool and New Inn and Cwmbran, has been pout out for public consultation.

The 'Abergavenny to Newport Rail Corridor Option Development and Appraisal' report lists three distinct proposals for rail development:
  • The basic option includes improving the interchange and parking facilities at stations in Abergavenny and Cwmbran, providing a disabled access bridge at Cwmbran along with basic improvements at Pontypool and New Inn station.
  • The middle option adds to the basic proposals by developing Pontypool and New Inn station, and improving parking and access to the A4042, and adding an infill service going from Abergavenny to Cardiff.

  • The enhanced or full option include all of the above with an additional hourly service between Cardiff and Abergavenny and creating a new station at Caerleon. 
The report, produced by Capita Symonds, recommends the medium option with the addition of the new Caerleon station. The report notes that the middle option would “results in over 168,000 new rail trips (105,000 from station improvements and 63,000 from frequency enhancements)”. The report anticipates that something like half of these rail journeys trips would be as a result of people choosing the train rather than the car to travel.

Interestingly enough a new Caerleon railway station is anticipated to add around 93,000 new rail journeys. The report estimates that there would be a increase in passenger numbers on the Abergavenny to Newport line of around thirty two percent when compared with whats happening at the moment.

SEWTA has asked members of the public to give their views of the plans. The consultation period closes on March 12th 2012.

Comments can be emailed to: sewtaconsultation@capita.co.uk or posted to:

Alison Walker
Ty Gwent
Lake View
Llantarnam Park
Cwmbran
NP44 3HR

Monday, 3 October 2011

THE DEVIL IS IN THE DETAIL...

The study commissioned by SEWTA (South East Wales Transport Alliance) amongst other things has recommended that extra trains should run (every two hours) on the line from Newport to Abergavenny, not to mention that Pontypool and New Inn station be developed (with park and ride facilities) accessed from the A4042. This along with the proposed (and much needed) new station at Caerleon and better car parking and bus links at Abergavenny and Cwmbran should be warmly welcomed.

The SEWTA Regional Transport Plan was approved by the Minister for Economy and Transport in January 2010 and following submission of a capital programme for 2010/11 implementation began in April 2010. SEWTA has produced proposals for the development of stations at Crumlin and Pye Corner stations (which would include bus stops and bike parking). The study of the Abergavenny line suggests that proposed improvements may result in an extra 168,000 new rail trips, something that will reduce car use, cut congestion and pollution.

The recent report builds on previous work, back in March 2010, SEWTA recommended on the line from Abergavenny via Newport to Cardiff, SEWTA has already proposed a new stations at St Mellons, and called for more frequent stopping services at Pontypool and New Inn. On the line from Chepstow via Newport to Cardiff, SEWTA has proposed new stations at Llanwern and Coedkernew, and an improved and more frequent services at Chepstow, Caldicot and Severn Tunnel Junction.

The SEWTA reports are well researched and well structured, and should have made a significant contribution to the debate, now is the time for action. Let's get it done...

Friday, 26 August 2011

THE TIME FOR EXCUSES IS PAST...


When it comes to railways in Wales, we tend to focus on anniversaries of rail closures rather than anniversaries of openings. This may well be because transport policy was something that was done to us rather than done for us. I mention this, because I noticed that a plaque has been unveiled marking the 150th anniversary of the arrival of the railway in Knighton (Powys).

The spectaular 22-mile section of the Heart of Wales line from Craven Arms, Shropshire, to Knighton was constructed in 1861, and manged to avoid being closed in the 1950's and 1960's.  A £5m project which upgraded parts of this rural railway was finished last year, reinstating five passing loops at Knighton, Llandrindod Wells and Llanwrtyd Wells in Powys, and at Llandovery and Llandeilo in Carmarthenshire. This is a small but positive step which could, with extra services lead to more regular and better used trains.

The Con Dem Westminster Government and the New Labour Government in Cardiff need to get serious about developing integrated public transport across the valleys and the south east in Monmouth constituency and beyond. For more than a few years Plaid in Monmouth has called for improvements to existing services and facilities and a series of feasibility studies to investigate re-opening previously closed railways as has happened in Scotland.

We face a future where cheap fuel will be a thing of the past, so we need to ensure that all our communities have reasonable access to a reliable cheap system of integrated public transport, at the heart of which needs to be our long neglected rail network. The old excuses about a lack of funding (despite the banking related financial crisis) are no longer acceptable; Wales making up 5% of the population of the UK, and makes significant contributions to the exchequer over the years - so we need 5% of the UK transport spend, and full control of our transport planning and our transport budget.

A devolutionary half-way house won't work anymore, it will not deliver or even give us the chance to deliver, even with legislative powers. The changes and reforms that are necessary to fix the problems in our country means that we need the tools to do the job. The botched and over complicated LCO system for creating legislation barely worked and has thankfully been consigned to the dustbin of history.

It didn't work with a nominally Labour Government and was never going to work with a Conservative dominated Government which is indifferent to any concept of devolution in particular and the needs of Wales in particular. Even with legislative powers, we are still in some sort of half devolved limbo state of governance, lacking a fair financial settlement. Let's be honest, with all the best will in the world this is not going to work well, even with an inert visionless New Labour government in Cardiff. Governance can no more be half devolved anymore than someone can be half free.

Wales needs a fair financial settlement so we can construct a decent system of integrated public transport. This is what has happened in Scotland, where significant strides have been made to reopen, redevelop and build a coherent and integrated public transport system. In the last twelve years in Wales there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (partially re-opened on Wednesday 6th February 2008).

Being brutally honest these were administrative rather than legislative projects, this has not been thye case in Scotland, where bills to reopen old railways were vigorously debated, scrutinised, amended and passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.

The Transport (Wales) Act which came into effect in February 2006 gave the National Assembly powers to plan and co-ordinate an integrated transport system, how much longer do we have to wait to see some vision? In the meantime the rail companies have been busy ramping up rail fares, attempting to reduce rail services, all with the tacit co-operation of the Westminster Labour Government and the Department for transport (in London).

Such duplicity has never been acceptable - it’s time for our government in Cardiff to take the long term view, to bite the bullet and actually put its money where its mouth is and work to redevelop our rail services, boost the development of rail freight and to co-ordinate rail and bus services across the whole of Wales. To do this effectively Wales needs to have full control of it's transport policy and transport budget devolved as quickly as possible and the franchise when it is renewed in 2017 needs to be run on a not for profit basis.

In the south east , we need Abergavenny and Chepstow railway stations to be real gateways, with fully integrated local bus services. We need better facilities at Severn Tunnel Junction and Caldicot railway stations and the provision of adequate safe secure parking facilities. We need feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station at Usk.

The final stage of the rail-link from Ebbw Vale to Newport needs to be completed and railway stations at Caerleon and Magor would help to reduce road congestion. Such developments would provide a regular rail service to local residents and reduce the ever increasing traffic burden from already overcrowded roads. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads.

If the Governments in London and Cardiff are really serious about cutting carbon emissions and reducing road congestion then we need work to get heavy goods back onto our railways. There is no quick fix, but, the time for excuses is over, we need to plan for the future. This may not be cheap but it can be done if the political will is there, as has happened in Scotland, where there is a useful combination of the will, the funding and interested private partners.

Tuesday, 10 May 2011

LEGISLATE OR ADMINISTRATE?

The new National Assembly, post referendum and post election now has legislative powers - one question that needs to be asked (and answered) is how will those legislative powers be used and to what end? One area for potential legislation is that of our railway network (such as it is). In the last twelve years there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly the Vale of Glamorgan Railway Line (which re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (which re-opened for passenger services on Wednesday 6th February 2008) were by their nature administrative rather than legislative unlike in Scotland (where specific bills to reopen old railways have been vigorously debated, scrutinised, amended and passed by the Scottish Parliament.

I mention this because I was just wondering when will we see bills placed before the National Assembly to:
  • A bill to reopen the Ebbw Vale (Rogerstone) to Newport railink 
  • A bill to reopen the Llangefni and Amlwch railway
  • A bill to construct new railway stations at Caerleon and Magor 
  •  A bill to reopen the Aberdare and Hirwaun railway (in the Cynon valley)
  • A bill to set aside and protect old railway lines from development in Wales for potential reopening

Sunday, 30 January 2011

GETTING ON WITH THE JOB

The one lesson that we should have learned by now is that we cannot rely on any Westminster Government to deliver for Wales. Let's electrify the Valley lines and the Ebbw Vale line (initially) into Cardiff by using some of the National Assembly's 0.78 billion transport budget. The Con Dem Westminster Government's has failed to stump up the cash for the electrification of the rail line between Swansea (originally only to Bristol) and London Paddington, a project that the last New Labour Government only considered in the last two years of Government (on occasion I do wonder what New Labour were doing in the previous eleven years at times), is disappointing. While we are at it, in the South East, we need railway stations at Caerleon and Magor and better facilities for passengers and more stopping services at Severn Tunnel, Chepstow and Abergavenny along with secure park and ride schemes and better integration of local bus services.

Sunday, 5 December 2010

TIME TO MOVE ON

The Con Dem Westminster Government's failure to stump up the cash for the electrification of the rail line between Swansea (originally Bristol) and London Paddington, a project that the last New Labour Government only considered in the last two years of Government (one does wonder what they were doing in the previous eleven years at times), is disappointing. One lesson that we should have learned by now is that we cannot rely on any Westminster Government to deliver for Wales.

The long awaited reinstatement of the rail link from Rogerstone to Newport, dependent on Network Rail's feasibility study which be announced in March 2011. Even with limited financial resources (a 0.78 billion transport budget) the National Assembly has committed itself to getting the job done – this commitment needs to become firm action next year, along with a new station in Ebbw Vale town.

In the South East, we need railway stations at Caerleon and Magor and better facilities for passengers and more stopping services at Severn Tunnel, Chepstow and Abergavenny along with secure park and ride schemes and better integration of local bus services. Serious consideration needs to be given to reopening the line from Little Mill to Usk. It's time to move on...

Friday, 3 September 2010

DOWN AT THE DIG

 









My second and final week on the dig at on the Priory Field in Caerleon, within the walls of the Legionary Fortress, is now drawing to a close.  It's been hard, hot and pretty exhausting but very interesting work as well as being fun. 

Final excavations are taking place this year, and will last up until mid September, involving staff and students from University College London (UCL) and Cardiff University and volunteers.

The dig is open to the public and there are guided tours of the excavation site, at 11am and 2.30pm daily, except for Monday's. You can keep up to date with progress via the excavation blog.

Saturday, 21 August 2010

DOWN AT THE DIG...

So now it's back to reality with a bump, and playing catchup. I have spent the last four days working as a volunteer (with trowel, mattock, shovel, bucket and wheelbarrow) on an archaeological dig on the Priory field, inside the Legionary Fortress at Caerleon - so no radio, no TV, no politics, etc.

So far it's been a fairly a typical August with sunshine, drizzle, humidity and gales - am pretty tired, but, it has been worth it and great fun. The dig is part of on-going excavations, which, have over the last four years, helped to identify eight previously unknown barrack blocks, three large granaries, a monumental metal workshop and a very large store building. You can keep up to date with progress via the excavation blog.

Final excavations are taking place this year, and last up until mid September, inside the Roman fortress involving staff and students from University College London (UCL) and Cardiff University. The dig is open to the public and there are guided tours of the excavation site, at 11am and 2.30pm daily, except for Monday's.

Back to reality, have I missed anything whilst i have been away...?

Monday, 9 August 2010

A RAIL RESTORATION

Perhaps, in this age of financial austerity, perhaps anticipated by David ("Call me Dave") Cameron's Con Dem's, the future trend is merely for Government (at all levels) to simply be there and to provide nothing or at least next to nothing for this costs the least. Think about it we had 13 years of New Labour Government and at the end of it what did we get, not a lot in my book.

The new bottom line, being when you have ineffective and inert Government, is that if you want a civic society or want to reopen an old railway station then you (as in us the citizens) have to make Government act on our behalf, whether it wants to or not. Now this is not the Big Society that Cameron has droned on about (before the election), this is people making Government (at all levels) pull its collective finger out and do what they want for their communities. And that's the stuff of a collective New Labour and Conservative nightmare ...

This potential future trend, has already been fully anticipated by the rail franchise holding companies, who are there as far I can cypher it, in it to make lots of money and provide a pretty minimal unresponsive service. Lets be honest here, our railways and our rail passengers have been neglected for long enough - we currently fork out a small fortune to the rail companies that hold the franchises - for a pretty poor unconnected service.

Despite the threat or promise (take your pick) of future cuts to the Welsh budget there are opportunities to make a real difference locally whether it be within our communities or to our neglected public transport infrastructure that should serve our communities. Many of our existing railway stations suffer from some pretty significant gaps in services, so are underused.

This is pretty basic stuff, if there are more stopping services then you will get more passengers. There is nothing quite so frustrating as standing on a platform watching a passenger train slow down to pass through the station without stopping. Our existing railway station need better toilet facilities, often lack any waiting room for passengers, if we invest in better facilities and better more frequent services then we will bring more passengers.

Now it's not just our existing railway stations that can be improved, there are plans to reopen a village railway station in Mid Wales that was closed in the 1960's. Passenger trains last stopped in Bow Street, near Aberystwyth over 40 years ago (in the South Caerleon, Magor and Pontrilas spring readily to mind). Now a local campaign group is working to reopen the railway station. Trafnidiaeth Canolbarth Cymru (TraCC), a group that works with councils on transport issues, is carrying out a feasibility study.

At the moment people living in Bow Street have to either drive to Borth or Aberystwyth to catch the train. People who would like to support plans for Bow Street station can write to:

TraCC
Canolfan Rheidol
Rhodfa Padarn
Llanbadarn Fawr
Aberystwyth
SY23 3UE

Or email enquires@tracc.gov.uk between now and September 2010.

Small scale transport projects seeking funding, are appraised under a scheme funded by the assembly government.Then the appraisal is resented to officials so it can be considered for the assembly government's national transport plan. Well organised small scale local campaigns may provide the best opportunity to make a real difference when it comes to reopening or improving the services of our railway stations.

There are a number of good examples to follow; there are campaigns to reopen Carno Station and the successes of the Severn Tunnel Action Group who have campaigned to restore rail services and improvements in the passenger infrastructure and Better Trains 4 Chepstow who are campaigning amongst other things for more stopping services at Chepstow, are but a few good working examples of well motivated well organised local campaign groups working hard to reopen or improve services and facilities at their local railway stations (and not doubt making Government and the rail franchise holders wish that they had never been born).

This is obviously the model to follow to get better rail services for our communities and to re-open old railway stations, it's time to make our Government at all levels far more responsive to what we want not what they want. There has been too much talk and far too little activity over recent years. That has got to change whether it be at UK, Welsh or local Government level. Don't say that you have not been warned...

Sunday, 4 July 2010

DON'T LET WALES MISS OUT

It looks like Wales may miss out on any chance of rail electrification this time thanks to a combination of New / Old Labour and the same old Tories. With Whitehall tightening its belts and facing significant spending cuts there is a real and growing concern that the proposed upgrade of the Swansea to Severn Tunnel (and on to London) railway may yet end up as a casualty of Tory spending cuts. No doubt New / Old Labour will be quick to blame the Tories (they have after all done this for years, even when they have been in power), but that would hide the fact that both Tony Blair and Gordon Brown's New Labour Government long ignored Wales and Welsh issues.  

The planned rail upgrade, was however, conspicuously absent from the George Osborne's list of capital projects that were to take place before his Budget speech. The rail project is being reconsidered as part of the Comprehensive Spending Review, which is due to be published in the autumn. With the Tories getting ready for what are expected to be pretty savage and deep spending cuts, what guarantees can be extracted for this key project to proceed - a good question that is in need a serious and urgent answer.

More locally within Gwent, the National Assembly's commitment (in March 2010) to finish the work on Gaer junction, so that direct trains can run between Newport and Ebbw Vale was warmly welcomed, along with the prospects of a new railway station in Ebbw Vale town centre and an hourly service. These are important small steps forward to improve our public transport infrastructure and to give people a real choice when it comes to using their cars or not. Now, while it it obvious that much more needs to be done, these improvements should be completed despite the threat of immanent budget cuts.

Elsewhere in south Gwent, there is much that can be done to improve our rail services. Both Caerleon and Magor would benefit from new railway station's and serious consideration should be given to reopening the line to Usk from Little Mill, In recent years we have seen hard won improvements to Severn Tunnel Junction, yet even here there is room for improvement. No to mention the fact that better facilities and better access is needed at Caldicot, Chepstow and Abergavenny Stations, as well as more frequent stopping services.

The National Assembly does not have the same powers over transport as does the Scottish Parliament (it should) and neither does it have the same financial settlement (Wales needs fair funding) - but despite these limits there is much that can be done. We also need to get serious about getting freight off the roads and onto the rails where it belongs - if this can be done along with rail electrification then we can reduce both pollution and road congestion. If Government wants to change the way we use public transport when we need a public transport system that's fit for purpose and fit for us to use.