Showing posts with label Severn Tunnel Junction. Show all posts
Showing posts with label Severn Tunnel Junction. Show all posts

Tuesday, 10 January 2017

A GHOST TRAIN?

Occasionally if you look very quickly on Newport Station, you may see the platform indicators flagging up an Ebbw Vale bound train. This may be the closest many rail passengers will come to seeing a ghost train. Despite regularly oft-repeated promises from the Labour in Wales government in Cardiff and more locally elected Labour in Newport representatives, there is no sign any time soon of a permanent rail connection between Ebbw Vale and Newport.

Nothing to see here... move along...

Since the Ebbw railway line reopened in 2008 and the new rail service failed to connect to Newport and the rest of the south east a variety of lame excuses have been offered which barely conceal that fact that the Welsh Government has been dragging its feet. Ironically periodic upgrades to track and signals in and around the Cardiff area meant that services do actually occasionally start and terminate at Newport.

The failure to connect the Ebbw vale line to Newport meant that commuters who live in the communities in the Ebbw valley are unable to travel directly to Newport by train and have little choice but to use their cars. They have been denied the opportunity of catching connecting trains to Bristol, Cheltenham, and beyond as well as travelling slightly more rapidly to Cardiff in the morning and back again in the evening.

This was simply a bad short sighted decision that resulted in commuters having little choice but to choose to drive to work. This lack of an easily accessible alternative helped to feed congestion on the M4. If we are lucky at some as yet undetermined future date the Ebbw vale link may actually begin to benefit those commuters who daily travel east to and from work.

What seems to be missing here in Wales is any real element of reopening old (or building new) railways as has happened in Scotland. In Wales in the last seventeen years there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (which re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (which partially re-opened on Wednesday 6th February 2008).

The reality was that these were largely administrative rather than legislative projects, and but for the existence of the National Assembly it is unlikely that they would have been hauled up from where they lingered on Network Rails’ priority list.  The National Assembly, has been (with a few exceptions) been pretty muted when it comes to making the case for rail.

This has certainly not been the case in Scotland, where bills to reopen old railways have been vigorously debated, scrutinised, amended and passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.

The Transport (Wales) Act, which came into effect in February 2006, gave the National Assembly powers if not the political will to plan and co-ordinate an integrated transport system. How much longer do we have to wait to see some vision? And some action?

In the meantime the largely non UK owned rail companies have been busy ramping up rail fares and quietly attempting to reduce rail services (they have been thwarted in the later endeavour by some well organised local pressure groups in the case of Severn Tunnel and Chepstow in South East Gwent). All of these things have been done with the tacit co-operation of various Westminster and Welsh Governments and the Department for Transport (in London).

Such duplicity can never been acceptable – it would be nice if the government in Cardiff woke from its self induced slumbers and took the long term view, and actually put its money where its mouth is and work to redevelop our rail services, boost the development of rail freight and to co-ordinate rail and bus services across the whole of Wales. To do this effectively Wales needs to have full control of its transport policy and transport budget devolved as quickly as possible and the franchise when it is renewed in 2017/2018 needs to be run on a not for profit basis.

The creation of a not-for-distributable-profit organisation to run Welsh railways is vital; profits would be available to invest in rail services. This could mean more frequent services in the South Wales valleys, more frequent journeys to West Wales and on the Cambrian line, as well as additional services between the north and south of Wales.

A Newport bound train from Ebbw Vale surely not?
This could also mean more investment in new rolling stock to help keep pace with increasing passenger demand.  Now, the clock is ticking as most of the preparatory work for the re-franchising needs to be undertaken during the current National Assembly term, so that a delivery model that is better suited to the needs of the people in Wales rather than the foreign state-owned railway shareholders dividend can be developed. 

Here in the south east, Abergavenny, Caldicot, Chepstow and Severn Tunnel railway stations should be real local transport hubs, with fully integrated local bus services. Better facilities for passengers are needed and the provision of adequate safe secure parking facilities is urgently required.

A feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station west of the town of Usk would benefit local commuters and rail travellers and reduce congestion. The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic and timber shipments would also help. As would a realistically scoped feasibility study into developing regional rail freight services, removing heavy Lorries from local roads. 

Such developments would provide a regular rail service to local residents and reduce the ever-increasing traffic burden from already overcrowded roads. One real local priority is the completion of the final stage of the rail-link from Ebbw Vale to Newport needs to be completed and railway stations at Caerleon (which has been in the UDB since 1986), it should not be a case of a station at Llanwern or Magor it must be both as they would all help to reduce road congestion.

Tuesday, 3 February 2015

ANTICIPATING A PREFECT STORM

On Friday evening, the much anticipated 6 Nations rugby internationals kick off, with Wales v England. Rugby fans are bracing themselves for the ordeal of a Friday night international match, with an 8pm kick-off and the logistical perfect storm that awaits them. Rugby aside simply getting to (and from) Cardiff on a Friday evening, with the lack of late trains may more than try fans patience.

If it’s going to be grim for Welsh Rugby fans, trying to come south or east from North and West Wales to get to Cardiff before kick-off then it’s going to be even grimmer afterwards when they try to get home. Bitter experience relayed by rugby fan have told me that the franchise holders will run short trains, by the time these trains reach Abergavenny, Pontypool, Cwmbran, Chepstow, Caldicot, Severn Tunnel Junction and Newport (not to mention Hereford, Lydney and Gloucester) they will be so full of people that passengers cannot board them.

Spare a thought for England fans, as the last London train leaves Cardiff before the game actually ends. Now much of the blame must lie with the 6 Nations organisers who once again have put profit before the interests of the fans and the game. Simply telling fans to go early, on a working day, on an evening (after work) with in some case little prospect of getting home at a sensible hour just won’t do. I seem to recall that Friday night games were only an experiment – clearly one that brings rich rewards to the Rugby authorities and immense inconvenience to the fans.

The usual old lame excuses are no doubt being rolled out by the franchise holders as to why there was no space, travel why the trains were short, etc. The real reason for the shoddy service is that it’s about profits, extra trains and extra carriages have to be rented and this hits profits and dividends.  The day that the rail franchise (in Wales and the marches) is run as a not for dividend profit franchise cannot come soon enough. 

Tuesday, 11 November 2014

A 0.5 FROM THE EAST GERMAN JUDGE...

The Westminster governments commitment to the electrification of the Great Western mainline through to Swansea (along with the electrification of the valley lines) may represent one of the largest commitment of resources to Wales for a specific project by a Westminster government in most people in Wales’s lifetimes. While this is significant it’s a job that upon completion will be at best partially completed because of a failure to commit to the electrification of the Severn Tunnel diversionary route from Kemble, in Gloucestershire to Swindon and through Lydney to connect with the mainline at Severn Tunnel Junction via Chepstow. 

As regular rail users will know the regular closure of the Severn Tunnel for maintenance tends to be an issue when it comes to weekend travel. Historically the diversion added an hour to and from weekend journeys to Paddington – the line was only single track. This section was finally upgraded to double track (completed in August 2014) is the only diversionary rail route between South Wales and London so the next step should be to electrify the diversionary route in parallel to the planned electrification of the Great Western mainline to Swansea.

In the event of a major accident or incident in the tunnel, perhaps a crash, a fire or even flooding, we need a fully operational alternative so that passenger and freight services to London are not affected. Talk to anyone who works the rails (or anyone who has relatives who work on the rails) in the south and they will tell you that the ageing Severn Tunnel is going to require more and more maintenance as time passes, it remains a vital transport link, but it ranks pretty low on Network Rails or Westminster’s list of priorities. 

This is a vital rail link between Wales and London (and Europe) and the only alternative to using the Severn Tunnel. We need some original thinking to solve this potential block on our rail links; the construction of a railway bridge / tidal fence close to the Second Severn Crossing should be seriously considered as part of any plans to harness the enormous renewable energy potential of the Severn Estuary. This could carry the main rail link from South Wales, solving the problem of the Severn Tunnel, enhance rail services from Severn Tunnel Station and generate sustainable energy, which we will need in the very near future.

Thursday, 23 October 2014

PREPARATION, ANTICIPATION, FRUSTRATION…


With another round of eagerly anticipated autumn rugby internationals set to run through November (aside from a collective fingers crossed) across much of the former county Gwent (and no doubt elsewhere) rugby fans and rail users will be preparing themselves for the ordeal of trying to get into Cardiff on overcrowded (or full) trains). I have no doubt that the franchise holder will run short trains, which by the time they reach the stations (e.g. Abergavenny, Pontypool, Cwmbran, Chepstow, Caldicot, Severn Tunnel Junction and Newport) in the green and pleasant old county of Gwent, will be so full of people that passengers cannot board. Every year in recent years it has been the same with the same old lame excuses being rolled out by the franchise holders to why there was no space, why the trains were short, etc. The real reason for the shoddy service is about profits, extra trains and extra carriages have to be rented and this hits profits and dividends.  The day that the rail franchise (in Wales and the marches) is run as a not for dividend profit franchise cannot come soon enough. 

Wednesday, 13 March 2013

GETTING BACK ON TRACK?

One way the Government in Cardiff could seriously reduce traffic on the M4 and on local roads in and around on Newport and across South Monmouthshire would be by supporting calls for new railway stations at Llanwern (it’s worth remembering that Newport Unlimited proposed a 1,000 space ‘park and ride’ facility for the proposed new station), Magor and Caerleon. These new stations  along with extra parking at Chepstow and extra parking (not to mention a road link to M48) at Severn Tunnel Junction would give hard pressed commuters something like a real choice when it comes to getting to and from work.  Ongoing and successful campaigns at Severn Tunnel and Chepstow have shown that people value their rail services and that the simple provision of better facilities and more stopping services can make a real difference.  New stations at Caerleon, Llanwern and at Magor would prove to be a less costly option and less environmentally damaging and more sustainable option and could help to cut congestion on already overused local roads.

Sunday, 13 January 2013

A CASE OF YES AND NO...

As elements of it directly affect Wales and as far as it goes, I cautiously welcome the new Network Rail modernisation programme which was announced last Tuesday. The electrification of the Great Western line from Swansea to London is the commitment to extend electrification to some of the Valley lines into Cardiff. Some £ 350 million pounds worth of investment has been allocated to electrify the Valley lines into Cardiff.

I have serious concerns about the apparent exclusion of the final stage of the Ebbw Vale line into Abertillery and into Newport from the plan and the timescale. The Network Rail plan suggests that even its somewhat limited Valley lines electrification programme will not be completed until around 2020. From an economic point of view it would make more sense to commence work on the Valley lines electrification programme as soon as practically possible.

What missing as far as I can see is any real element of reopening old (or building new) railways as has happened in Scotland. In Wales in the last thirteen and half years there have been two successful railway re-openings carried out by Network Rail at the request of the National Assembly; the Vale of Glamorgan Railway Line (re-opened on Friday 10th June 2005) and the Ebbw Valley Railway Line (partially re-opened on Wednesday 6th February 2008).

These were administrative rather than legislative projects, and but for the existence of the National Assembly it is unlikely that they would have been hauled up from where they lingered on Network Rails’ priority list.  The National Assembly, has been (with a few exceptions) been pretty muted when it comes to making the case for rail. This has not been the case in Scotland, where bills to reopen old railways have been vigorously debated, scrutinised, amended and passed by the Scottish Parliament. If we are serious about integrated public transport then we are going to have to get serious about how we are going to develop and redevelop our public transport infrastructure.

The Transport (Wales) Act which came into effect in February 2006 gave the National Assembly powers (if not the political will) to plan and co-ordinate an integrated transport system, how much longer do we have to wait to see some vision? In the meantime the rail companies have been busy continuing to ramp up rail fares and attempting to reduce rail services (they have been thwarted in the later endeavour by some well organised local pressure groups in the case of Severn Tunnel and Chepstow in South East Gwent). All of these things have been done with the tacit co-operation of various Westminster Governments and the Department for Transport (in London).

Such duplicity has never been acceptable – it would be nice if the government in Cardiff woke from its self induced slumbers and took the long term view, and actually put its money where its mouth is and work to redevelop our rail services, boost the development of rail freight and to co-ordinate rail and bus services across the whole of Wales. To do this effectively Wales needs to have full control of its transport policy and transport budget devolved as quickly as possible and the franchise when it is renewed in 2017 needs to be run on a not for profit basis.

The creation of a not-for-distributable-profit organisation to run Welsh railways is vital; profits would be available to invest in rail services. This could mean more frequent services in the South Wales valleys, more frequent journeys to West Wales and on the Cambrian line, as well as additional services between the north and south of Wales. This could also mean more investment in new rolling stock to help keep pace with increasing passenger demand.  Now, the clock is ticking as most of the preparatory work for the re-franchising needs to be undertaken during the current Assembly term, so that a delivery model that is better suited to the needs of the people in Wales rather than the shareholders dividend can be developed.

Here in the south east, Abergavenny, Caldicot, Chepstow and Severn Tunnel railway stations should be real local transport hubs, with fully integrated local bus services. Better facilities for passengers are needed and the provision of adequate safe secure parking facilities is urgently required. A feasibility studies into the development of a Parkway Station at Little Mill and the possibilities of re-opening the railway line from Little Mill to Usk and the development of a new railway station west of the town of Usk would benefit local commuters and rail travellers and reduce congestion.

The re-opening of Pontrilas Railway station (in south Herefordshire) for passenger traffic (and timber shipments) would also help, as would a feasibility study into developing regional rail freight services, removing heavy Lorries from local roads. Such developments would provide a regular rail service to local residents and reduce the ever increasing traffic burden from already overcrowded roads. One real local priority is the completion of the final stage of the rail-link from Ebbw Vale to Newport needs to be completed and railway stations at Caerleon, Llanwern and Magor would all help to reduce road congestion.

Sunday, 1 May 2011

CHRIS PAUL FOR NEWPORT EAST

Chris Paul - Plaid's candidate for Newport East 
Chris Paul is the Plaid Cymru candidate for Newport East constituency in the Welsh National Election to be held on the 5th May 2011. He can be contacted via e-mail at ChrisPaul@plaidcymru.org .

Chris has lobbied against the closure of the Passport Office in Newport. He  has called for the Severn Bridge to be brought under Welsh Government control with reduced tolls. Chris will fight for better rail services and facilities at Caldciot and Severn Tunnel Junction and has called for a new railway station at Magor.

Chris Paul was born in Abergavenny in 1978 and grew up in Monmouthshire. He was educated at Monmouth Comprehensive and Dartington College of Arts. Like many he moved away from Wales to go to University and then to work. He has lived in the South West of England, London, and South America before returning to Wales to settle with his partner in 2007.


Chris has been a grassroots Plaid activist since that time and has contributed to the party at both local and national level, through policy development, canvassing, blogging, and as branch press officer. His professional background is in the private sector, grounded in the arts and media.

He currently works for an international media and events company in Bristol. Chris is an English and Spanish speaker, and Welsh learner. Apart from politics Chris is a widely published poet and critic, and plays the guitar. A member of Amnesty International, his political interests include the arts and culture, economic development, the environment and international affairs.

Sunday, 17 April 2011

WHAT ABOUT GWENT?

I welcome Network Rail's plans to make improvements to stations, lines and signalling equipment could double the rail capacity of the region by 2015 and to ease railway congestion in Cardiff and the south Wales valleys have been revealed. It has long been recognised that passenger demand in Cardiff and the valleys is increasing at 8% on average each year.

Network Rail, which owns and operates Britain's rail infrastructure, has predicted that the number of passengers travelling in Cardiff and the valleys would exceed 12m per year by the end of 2015 and has said some 900 trains already travelled daily through the Cardiff area, but the railway needed more capacity by the end of the decade.

The proposed changes would remove the rail bottleneck on the Cardiff city line and allow an extra four trains an hour to run through the area. The £200 million pound improvement plan will help the railway manage the increasing numbers of passengers longer-term and will allow for more and longer trains to run on the valley lines, with 600 more seats during the rush hour.

Additionally more freight trains would run in Cardiff, boosting the business sector, and more robust and efficient signalling equipment would improve reliability of services. One question though - what about Gwent?

In the south east we could do with railway stations at Caerleon and  Magor, not to mention the opening of the line between Newport and Ebbw Vale to passenger traffic. We need far better facilities for passengers at Abergavenny, Caldicot, Chepstow and Severn Tunnel Stations - including save and secure park and ride facilities - to provide and alternative means to getting to and from work, not to mention a start being made on the electrification of the Gwent Valley lines.

Sunday, 30 January 2011

GETTING ON WITH THE JOB

The one lesson that we should have learned by now is that we cannot rely on any Westminster Government to deliver for Wales. Let's electrify the Valley lines and the Ebbw Vale line (initially) into Cardiff by using some of the National Assembly's 0.78 billion transport budget. The Con Dem Westminster Government's has failed to stump up the cash for the electrification of the rail line between Swansea (originally only to Bristol) and London Paddington, a project that the last New Labour Government only considered in the last two years of Government (on occasion I do wonder what New Labour were doing in the previous eleven years at times), is disappointing. While we are at it, in the South East, we need railway stations at Caerleon and Magor and better facilities for passengers and more stopping services at Severn Tunnel, Chepstow and Abergavenny along with secure park and ride schemes and better integration of local bus services.

Sunday, 5 December 2010

TIME TO MOVE ON

The Con Dem Westminster Government's failure to stump up the cash for the electrification of the rail line between Swansea (originally Bristol) and London Paddington, a project that the last New Labour Government only considered in the last two years of Government (one does wonder what they were doing in the previous eleven years at times), is disappointing. One lesson that we should have learned by now is that we cannot rely on any Westminster Government to deliver for Wales.

The long awaited reinstatement of the rail link from Rogerstone to Newport, dependent on Network Rail's feasibility study which be announced in March 2011. Even with limited financial resources (a 0.78 billion transport budget) the National Assembly has committed itself to getting the job done – this commitment needs to become firm action next year, along with a new station in Ebbw Vale town.

In the South East, we need railway stations at Caerleon and Magor and better facilities for passengers and more stopping services at Severn Tunnel, Chepstow and Abergavenny along with secure park and ride schemes and better integration of local bus services. Serious consideration needs to be given to reopening the line from Little Mill to Usk. It's time to move on...

Thursday, 15 April 2010

NOT TAKING NO FOR AN ANSWER

We need more investment in our railway stations, better facilities for passengers and more stopping services at Caldicot, Chepstow and Severn Tunnel Junction railway stations. This would offer a realistic alternative to using the car and is something that manages to happen in most European countires on a daily basis - just not here.

In south Monmouthshire, Caldicot and Chepstow Railway Stations should be real assets to the community – the years of slow neglect must become a thing of the past, they should be a real transport hubs which inter-connect more fully with local bus services, regional rail services and provide links to enable rail travelers to access intercity services.

The quiet on-going neglect may well have (for the moment stopped) and the provision of better station facilities which is not a pipe dream, could make a real and significant difference to rail passengers from east Newport, south east Monmouthshire, the lower Wye Valley and the Forest of Dean.

Plaid Cymru, in Monmouth constituency has called for:
  • More stopping services at Caldicot, Chepstow and Severn Tunnel Junction Railway Stations during peak and non-peak hours.
  • The provision of better facilities for passengers including waiting rooms for travelers.
  • More safe and secure parking facilities at the stations.
  • Better more thought out integration of Local bus services with train arrivals.
  • The provision of disabled access to the station platforms.

The Plaid driven One Wales Government, working with Monmouthshire County Council and Network Rail should work to develop safe and secure car parking, and an integration of local bus services with train arrivals. There are still some pretty horrendous gaps in services, more trains need to stop at both Caldicot and Chepstow; there is nothing quite so frustrating as standing on a platform watching a passenger train slow down to pass through the station without stopping. There’s a real need for toilet facilities and extended waiting rooms for passengers at both stations, investment in facilities and better services will bring more passengers.

An example of what’s possible can be found at Severn Tunnel Junction where the Severn Tunnel Action Group continues to fight to develop the railway Station. They have delivered real results for rail users, with retained rail services, better passenger waiting areas, new electronic information boards, improved parking facilities and the restoration of platform 4 which opened as of Monday 4th January 2009, means that there should be less delays to train services.

Over the years they have reversed alleged irreversible and permanent cuts in rail services which prevented passengers journeying to Bristol, Bath, Newport and Cardiff and beyond. They are still campaigning to get the foot bridge and the provision of lifts for easy access for disabled and elderly rail passengers. So there is some merit in not taking No for an answer - particularly if you want a better rail service.

Tuesday, 30 March 2010

THINK DIFFERENT - INVEST IN RAIL

The National Assembly’s recent commitment to finish the work on Gaer junction, so that direct trains can run between Newport and Ebbw Vale is to be warmly welcomed, along with a possible new railway station in Ebbw Vale town centre and an hourly service. Much more obviously needs to be done, and despite the threat of potential or immanent cuts, there is much that can be done to improve our rail services.

There is a need for railway station's at Caerleon and Magor and consideration should be given to reopening the line to Usk from Little Mill, There have been improvements at Severn Tunnel Junction, there is room for improvements in facilities and access at Caldicot, Chepstow and Abergavenny Stations, not to mention more frequent stopping services.

We also need get freight off the roads and onto the rails which would along with rail electrification cut both pollution and road congestion. If Government wants to change the way we use public transport when we need a public transport system that’s fit for purpose and fit for us to use.

Wednesday, 5 August 2009

SEVERN TUNNEL - TIME FOR SOME LONG TERM THINKING

Now don't get me wrong I warmly welcome the plans to electrify the Swansea to London rail line - this is long overdue and down to some exceptionally hard negotiating by Deputy First Minister, Ieuan Wyn Jones (AM). The multi-million pound upgrade and electrification of the rail line between London and Swansea, which should be completed by 2017 and should also cut 20 minutes off the existing journey time is to be warmly welcomed.

However, when the Severn Tunnel is closed for maintenance rail traffic from South Wales is diverted via a single-track 12-mile section of line between Swindon and Kemble (in Gloucestershire) any plans to upgrade this section to double track as it is the only diversionary route between Wales and London were conspicuous by their absence from network Rail’s plans last November.

The aging Severn Tunnel requires more maintenance as time passes, it remains a vital transport link, but ranks pretty low on Network Rails list of priorities. Last November, the Office of Rail Regulation’s settlement for Network Rail allocated some £26 billion pounds some 2.4 billion less than requested; this is disappointing as it has forced Network Rail to drop a number of projects. One project to restore the 12 miles of single track to double from Kemble to Swindon was dropped, the reduced capacity of this line adds an hour to passenger journeys as trains to and from Wales have to wait for services coming in the opposite direction.

We need some original thinking to solve this potential block on our rail links; one of the options being considered as part of the review of proposals for generating energy from the Severn Estuary; is the construction of a smaller barrage or tidal fence close to the Second Severn Crossing. This could relatively easily carry the main rail link from South Wales, this is the kind of joined up original thinking we need to solve the problem of the Severn Tunnel and to generate sustainable energy, both of which we will need in the near future.

Monday, 15 June 2009

LETTING THE TRAIN TAKE THE STRAIN

The Association of Train Operating Companies report which was published today has identified (in England) some 14 lines and 40 new stations that could be developed (or redeveloped) to serve at least one million extra rail passengers. This report should be welcomed because it is the first positive thought from the railway industry towards reversing some of the cuts brought in by Dr Beeching (at the behest of the Conservative Government) in the 1950’s and 1960’s.

While this report only applies to England – the National Assembly Government, which has had the power to do stuff with the railways since The Transport (Wales) Act 2006 – gained Royal Assent in February 2006. This Act gives powers to plan and co-ordinate an integrated transport system for Wales to the National Assembly for Wales.

So the National Assembly should also actively consider what can be done in Wales to make life easier for rail travelers and to develop the rail network. The highly successful re-opening of the Ebbw Vale line in Gwent (soon to hopefully be reconnected to Newport) has proved that the public is more than willing to make use of revived rail services for the morning and evening commute to work and at other times of the day.

In south east Monmouthshire, the railway stations at Severn Tunnel and Chepstow Railway have been long neglected, they need to viewed as real assets to their communities and the years of slow neglect must become a thing of the past. Almost anywhere else in Europe and in much of the UK, these rail way stations would be viewed transport hubs which would inter-connect more fully with local bus services, regional rail services and provide links to enable rail travelers to access intercity services and beyond.

The quiet on-going neglect must stop and anyone who has been half frozen at either station while waiting for a train on dark midwinter mornings would agree that there is a need to provide better station facilities which would make a real and significant difference to half frozen and soaked rail passengers who use these stations who hail from east Newport, south east Monmouthshire, the lower Wye Valley and the Forest of Dean.

Plaid in Monmouth constituency has called for:

  • More stopping services at Severn Tunnel Junction and Chepstow Railway Stations during peak and non-peak hours.
  • The provision of station toilets.
  • More safe and secure parking facilities at the stations.
  • Better more thought out integration of Local bus services with train arrivals.
  • The provision of disabled access to the station platforms.
  • The construction of extended waiting rooms for passengers.

The Plaid driven One Wales Government, working with Monmouthshire County Council and Network Rail should work to develop safe and secure car parking, which should be combined with the integration of local bus services with train arrivals. There are still some pretty horrendous gaps in provided services, more trains need to stop at both Severn Tunnel and Chepstow; there is nothing quite so frustrating as standing on a platform watching a passenger train slow down to pass through the station without stopping or even stopping in the station – especially when you the passenger cannot get onto it.

The actual rail service aside, facilities are pretty basic, there is a real need for toilet facilities and extended waiting rooms for passengers at both stations, not to mention something must be done as a matter of urgency to provide decent access for elderly and disabled travelers, who have to make use of footbridges without lifts to access some of the platforms. If we are really serious about our rail services then let’s fix what we can fix and make a real investment in facilities and better services which will help to bring in more rail passengers.